Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST � Location: A.M. p6 Lot /� Zone of Cobution: In Out_ Acreage Commercial: Residential: V Street: 02 7-4.Snell e S7-: Village: Yete/y 2-, `Pa re'- Floor Plan: ✓ #Bedrooms: Owner: 76se'ro H 8- i picry illa)- Installer. Cap Q u (o J eG' ►1-- i o 3 C Address: /iv glisoi aco�' G'i r,.t 44 , Al Phone: 5-Ge-9'77-- 677 Phone: Builder: Engineer: G -,,A)C Address: Phone: 9 - 73 x.$77 Phone: N/A YES NO 1.Required#of copies received f 2.Date of soils exam and percolation test not older than 2 years 1/f 3.4-5 ft of naturally occurring pervious material, above water table 5/� 4.Foundation 2 ft above high point of road . H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands ✓ 7.Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I o f-r 4 / .. 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: (1 ,1) 1i 12.System meets all other setback requirements Var.: / ./ 13.Uses adjustment for maximum high groundwater Var.: r/ 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: / 15.System not in top or subsoil(A,B horizons) or 5'removal ✓ 16.Proposed contours are suitable 17.System meets slope requirements-min. 1/8", I/4"preferred / 18.System meets breakout requirements PVC liner: Wall: V / 19. Specified tee sizes are proper, gas baffle on outlet tee .// 20.Sewage is under 10,000 gpd for parcel ✓4 21.No garbage disposal V, 22. System adequately sized for its intended use !/ 23.Minimum 6"stone or compacted below tank and dbox V y/ 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field ✓ / 26.Electrical permit for pump chamber/Separate meter for duplexes ✓ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size V/ 28.Septic tank/pump chamber to be factory waterproofed Ali/ 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: f 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature // 33.H-20 loading is subject to vehicular traffic, groundwater Pf20 vGGyiL V/ 34.Title V Application and permit fee, installer signature V 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map .3 i cps Y Plan reviewed by: `1/7/ 6_ 6/03/03