HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
�
Location: A.M. p6 Lot /� Zone of Cobution: In Out_ Acreage
Commercial: Residential: V
Street: 02 7-4.Snell e S7-:
Village: Yete/y 2-, `Pa re'- Floor Plan: ✓ #Bedrooms:
Owner: 76se'ro H 8- i picry illa)- Installer. Cap Q u (o J eG' ►1-- i o 3 C
Address: /iv glisoi aco�' G'i r,.t 44 , Al Phone: 5-Ge-9'77-- 677
Phone:
Builder: Engineer: G -,,A)C
Address: Phone: 9 - 73 x.$77
Phone:
N/A YES NO
1.Required#of copies received f
2.Date of soils exam and percolation test not older than 2 years 1/f
3.4-5 ft of naturally occurring pervious material, above water table 5/�
4.Foundation 2 ft above high point of road . H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands ✓
7.Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I o f-r 4 / ..
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: (1 ,1) 1i
12.System meets all other setback requirements Var.: / ./
13.Uses adjustment for maximum high groundwater Var.: r/
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: /
15.System not in top or subsoil(A,B horizons) or 5'removal ✓
16.Proposed contours are suitable
17.System meets slope requirements-min. 1/8", I/4"preferred /
18.System meets breakout requirements PVC liner: Wall: V
/
19. Specified tee sizes are proper, gas baffle on outlet tee .//
20.Sewage is under 10,000 gpd for parcel ✓4
21.No garbage disposal V,
22. System adequately sized for its intended use !/
23.Minimum 6"stone or compacted below tank and dbox V
y/
24.Manhole covers within 6"of grade,pump chamber cover to grade
25.Inspection port on plastic chambers/leach field ✓ /
26.Electrical permit for pump chamber/Separate meter for duplexes ✓
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size V/
28.Septic tank/pump chamber to be factory waterproofed Ali/
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial: f
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature //
33.H-20 loading is subject to vehicular traffic, groundwater Pf20 vGGyiL V/
34.Title V Application and permit fee, installer signature V
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37.Check area lots for groundwater/Label groundwater in Assessor's Map .3 i cps Y
Plan reviewed by: `1/7/ 6_ 6/03/03