HomeMy WebLinkAboutCertificate of Occupancy Oc•Yeg4 TOWN OF YARMOUTH Building Department CERTIFICATE OF
r0 (508) 398-2231 ext.1261 OCCUPANCY
14.1;,.. � ' y j PERMIT NO BLD-19-004598
*�IgpN.
Glen Metrano
ADDRESS: 141 SEAVIEW AVE, SOUTH YARMOUTH, MA 02664 ZONING DISTRICT Bldg.Type: Residential
SUBDIVISION MAP BLOCK LOT 025.63 BUILDING IS TO
BE Const. Type
REMARKS New Construction: Modular-780 CR MSBC, 9`" Edition, Te :ylaws—
3 bedroom, 2.5 baths, kitchen, living room, dining room oom, : ndry, •••
as per plans dated 2/25/19.
CERTIFICATE OF INSPEC ' O
DATE: i/ '�� BUILDING OFFICIAL: r_ �� /
RICHARD &DELENA GENTILE
BUILDING DEPT BY
141 SEAVIEW AVE
SOUTH YARMOUTH, MA PHONE
1IS PERMIT CONVEYS NO RIGHT TO OCCUPOY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR
ERMANENTLY.ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE
JRISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF
JBLIC WORKS.
CERTIFICATE OF OCCUPANCY
BUILDING INSPECTIONS APPROVALS
ELBE: // -OTHER:- C oms Rva-749/0
DATE: gI //y//q DATE: 9Ii thq
INSPECTOR S� c���^� INSPECTOR: / _
ELECTRICAL BOARD OF HEALTH " i i9_fl ( - `
DATE: ( 91'(� DATE: — .GI•wiGt�,y
Afr b
INSPECTOR: INSPECT ,o
v0/t4v c Alyc
PLUMBING/GAS FINAL BUILDING
DATE: a/0 (f DATE: 51(9 �j
2
INSPECTOR: L.i'2hl INSPECTOR: T/n7 f
COMMUNITY DEVELOPMENT: DATE NAME
of-gq TOWN OF YARMOUTH Building Department BUILDING
..; •'fir, (508) 398-2231 ext.1261
�� PERMIT NO BLD-19-004598 PERMIT
�f,. .,""' " 'j��`Yx ISSUE DATE .02/27/2019 JOB WEATHER CARD
- APPLICANT :GLEN M METRANO PERMIT TO New Buildinq
AT(LOCATION) i141 SEAVIEW AVE,SOUTH YARMOUTH, MA 026 I ZONING DISTRICT R-25 Bldg.Type: ;Residential ��
SUBDIVISION MAP BLOCK LOT '025.63 BUILDING IS TO BE: CONST TYPE V B I USE GROUP R-3
REMARKS New Construction 780 CMR MSBC,9th Edition,TOY Bylaws-Modular-3 CONTRACTOR
bedroom, 2 1/2 baths, kitchen,living room, dining room,mudroom,laundry, LICENSE CSFA-054085
loft as per plans dated 2/25/19.(781-944-1830)Decks/landings will require 'Construction Supervisor 1
separate permits. NOTE: A Certified As Built is required before final ;-GLEN M METRANO
:GLEN METRANO
.____._-w_ Lynnfield, MA 01940
AREA(SQ FT) 322,561 800 EST COST($) 211000.00 PERMIT FEE($) .1,306.00
OWNER RICHARD&DELENA GENTILE
:.____._...._ ..._. -_.a-- BUILDING DEPT BY
ADDRESS , 141 SEAVEIW AVE
:SOUTH YARMOUTH MA 02664 PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS -
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
I "",- t , ," --;4.," ,r,.- ..... .* . (3 c.gs.:1,c6 4/3/0
cf..-: :5-P A.r77 CA ACk ‘CI R‘i)(14 &:Er q I I it i 1/6_,
F0Q' I�a t -��'vm.„ f'!G r(iIC Cyr
ti �\ 1- '1L Q N/i/�/
ir
4
OTHER: I
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARr1VF
TOWN OF YARMOUTH Building Department BUILDING
(508) 398-2231 ext.1261
, PERMIT
0 ,,�,.� , PERMIT NO 'BLD-20-000165
164 "°`�" 10 ISSUE DATE 07/22/2015
JOB WEATHER CARD
APPLICANT GLEN M METRANO PERMIT TO Addition
AT(LOCATION) 141 SEAVIEW AVE, SOUTH YARMOUTH, MA 02 ZONING DISTRICT R-25 h°Bldg.Type: Residential
__
___~m
SUBDIVISION MAP BLOCK LOT 025.63 BUILDING IS TO BE: ;'CONST TYPE V B USE GROUP R-3
REMARKS Addition-construct 7 x 16 deck(603-930-6857) CONTRACTOR
LICENSE CSFA-054085
Construction Supervisor
GLEN M METRANO
NO
GLEN METRANO
— — — — -- Lynnfield, MA 01940
AREA(SQ FT) 322,561,800.' EST COST($) 15000.00' PERMIT FEE($) 75.00
OWNER RICHARD GENTILE
BUILDING DEPT BY
ADDRESS 141 SEAVIEW AVE
SOUTH YARMOUTH 02664^ --�-
/ �/42 6e41.4„g,— PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPIED UNTIL FINAL INSPECTION HAS
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE. -
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
•
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS VC', STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THL � r(MIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.