HomeMy WebLinkAboutDuct Leakage Report •• HOME ENERGY RATERS L LC
BUILDING%10111 PERFORMANCE TESTING
RECEIVED
Duct Leakage Report -��-- --
SEP . 4 2019
35 Amy Lane Test Mode I I
Pressurization C BUILDING DEPARTMENT
Yarmouth Hy
08/26/2019 Test Pressure
25.0 Pascals —
Braga Brothers Testing Equipment
2015 IECC Energy Code Minneapolis
or
Total CFM@25 or Total Duct Leakage Percentage
42.00 0.03
Total Square Footage
1366.00
Maximum Allowable Leakage
54.64
HVAC Duct Test
Unconditioned 1366 C 42 35,^Y LA., 0.03
Basement
180 STATE ROAD SUITE 2U SAGAMORE BEACH,MA 02562-(508)833-3100-ENERGYCODEHELP.COM-INFO@ENERGYCODEHELP.COM
powered bygoconvos www.gocanvas.com
o� Yq�4 TOWN OF YARMOUTH Building Department• BUILDING
- 4 (508) 398-2231 ext.1261
14.0C PERMIT NO BLDSM-20-000975 PERMIT
F ' ,o ISSUE DATE 08/22/2019 y JOB WEATHER CARD
„
APPLICANT Braga Bros Inc PERMIT TO AT(LOCATION) 35 AMY LN YARMOUTH PORT,MA 02675 ZONING DISTRICT Bldg.Type: .Residential
SUBDIVISION MAP BLOCK LOT 123.67 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS Sheet Metal-Install 60K BTU furnace with 2.5 ton air conditioning to serve CONTRACTOR
whole house with heating and cooling(508-827-4260) LICENSE 612
Sheet Metal Workers-
Braga Bros Inc
110 Breeds Hill Rd
------ - � Hyannis,MA 026011864
AREA(SQ FT) 683107 920. EST COST($) 10000.00 PERMIT FEE($) 50.00
-OWNER `MEDEIROS ALLISON E
BUILDING DEPT BY
ADDRESS HUSAK BRETT D, 35 AMY LN
YARMOUTH PORT MA 02675 aAc f IC..... / IVJNE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWAL OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPIED UNTIL FINAL INSPECTION HAS
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.