Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon correlation of work,gmpedion and testa shall be made by the contractor's representative and witnessed by and owner's representative.All defects shad be
co rected and system left In service before contractor's personnel Malty leave the Job.
A meditate shall be 1%led out and signed by both representatives.Copies shell be prepared for approving authorities,owners,and contractor. ft is understood the
owner's representative aiglndure in no way prejudices any direr against contractor for faulty metered,poor workmanship,orfailure to comply with approving
authority's refits or local ordinances Q l
Property n St ail' ) 3 tN Igfr ''ta, /�,rtwA cap1A W) Date Lj ,7 •1 ia i
Accepted by approving authorities(nannies)
S ck.fi IN lc rnrtc, t", f",rc- Pc Q
Adder
Plans a& o i Z M•µ,n 54 Sw4r yotilkz,►it" n",. _________
Installation conforms to accepted plans 0 es
Equipment used is approved 0 es 0 o
If no,explain deviations
Has person in charge of fire equipment been instructed as to
location of control valves and care and maintenance of this (Yes°No
If• no,explain
deviatron
Instructions
Have copies of the following been left on the premises? iles o1.System components instru tions 2.Caine and maintenance instructions es o3.NFPA 25 es —
Location ofSupplies build
system. Year of Temperadxe
Make Model manufacture Orifice size Quantfty , rating
1-1 c-a 315 lie Poi 4 IQ., op
Sprinklers ,1-1(6 i3J. NA-- 14,71 f/et.. ).,1-t iss
.T.1 Gv t 3 1 $� 0-o1 tC %n- . I ;r?,Dd
. fiA co , i y,$Y3s 1t, SO 2+r►Ql { •' I.. 15 s
.'tit q Ti 5.33C D r Qtvt 1 41 1 '' 135
Pipe and Type of pipe BU(SCH 40
des Type of fittings }CAST IRON THREADED
Alarm device Maximantime ktopenilethlnigh test connection
Alarm valve or Tvoe Make Model Minutes Seconds
flow indicator VSD
Dy Valve Q.0.D.
Make Model Serial no. Make Model Serial no.
Time to trip through Water Top point err
Time water reacher. cl Man operated
Dry pipe test connection1.2 Pressure Air pressure
operating psiMinutes —Seconds Yes No
test Q.O.D. M seo�6s ?0 50 1 ,)"' i IS I/`
von .
O.O.D.
If no,explainOpera �E )Hyd
Rohl Ea►aservised (
tjYes iC[ Cf4ia supli orvleed fires
Deluge and ` Does valve from the manual trip,remote,orb control stations? C JYes E
Is there an accessible fadMy in each oy8s Ow If no,explain
preactioncircuit for tasting? Does each operate� Does each circuit valve . M time to operate
VaIvesVeS Make Mode loss alarm? release? release .
Yes No Yes No Minutes Seconds
Location Malta and Residual pressure
Pressure
and floor model Setting Static ure (towing) Row rate
reducing valve , Inlet OW) Outlet(psi) Inlet(psi) Outlet(psi) Row(gpm)
test •
r 1 Measure from time inspector's test creifteclioft is opened
2 NFPA 13 only requires the 60-second limitation in specific sections
44#10
Hwkostatic Hydrostatic test shall be made at not less than 200 psi(13.6 bar)for 2 hours or 50 psi(3.4 ba)above static presage
in excess of 150 psi(10.2 bar)for 2 hours. Differential dry-pipe valve clappers shall be left open during the test to prevent damage
Test AN aboveground piping leakage shall be stopped
Description Pneumatic:Establish 40 psi(2.7 bar)air pressure and measure drop,which shall not exceed 1%psi(0.1 bar)in 24 hours. Test
pressure tanks at normal water level and air pressure and measure air pressure drop,which shall not exceed 131 psi(0.1 bar)In
24 hours.
All piping hydrostatically tested at psi( bar)for 2 hours If no,state reason
Dry piping pneumatically tested es o
Equip operates properly • es o
Do you certify as the sprinkler contractor that additives and corrosive chemicals,sodium silicate or derivatives of sodium site,
brine or other corrosive chemicals were not used for testing systems or stopping leaks?
6)1 Yes QNo
Drain Reading of gauge located near water Residual pressure with valve in test
Tests test supply test : CITY psi( bar) connection open wide: ! pe( bar)
Underground mains and lead-in connections to system risers flushed before connection made to sprinkler piping
Verified by copy of the Contractor's Material and Test Ofes Other Explain
Certificate for Underground Piping
Flushed by installer of underground sprinkler piping {71(es
If powder-driven fasteners are used in concrete,has (Dyes ONO if no,explain
representative sample testing been satisfactorily completed?
Blank testing Number used Locations Number removed
gaskets
Welding PiPIrl9 Oyes®No H Y
Do you certify as the sprinkler contractor that welling procedures Oyes
comply with the requirements of at least AWS B2.1?
Welding Do you certify that the welding was performed by welders qualified in QYes ONo
compliance with the requirements of at least AWS 82.1?
Do you certify that the welding was carried out in compliance with a documented quality control Q(es
procedure to ensure that all discs are retrieved,that openings in piping are smooth,that slag and
other ding residue are removed and that the internal diameters of piping are not penetrated?
Cutouts(discs) Do y0ucertifythat you have a control feature to ensure that all cutouts(discs)are retrieved? e(,
Hydraulic data Nameplate provided? if no,explain v�
nameplate
Remarks Date left in service with all control valves open
Nameofsprinkiercontractor Peak Fire Protection Co., Inc.
Tests witnessed by
For property owner(signed) Tice Date
Signatures _ Steen t ,4 S/ l Y/2017
For sprinkler meter(signed) Ne Date
041 g tdccL► 4 ,1 s0006 5/q/i't
Co\ ho' ?u 6314 G l (..AS hoot_
200113
Additional
•
explanations
and notes