HomeMy WebLinkAboutBld-20-002143 ,04\C LQA (D I Z"Z
V.Y4 ; TOWN OF YARMOUTH Building Department BUILDING
,, 4. (508) 398-2231 ext.1261
0v , �' PERMIT NO BLD-20 002143 PERMIT
^°.tom„ Z. ISSUE DATE 10/21/2019 JOB WEATHER CARD
APPLICANT TUPPER CONSTRUCTION CO PERMIT TO Repair
AT(LOCATION) 5 BRENTWAY DR,SOUTH YARMOUTH,—MA ZONING DISTRICT Bldg.Type: ResidentialA4
SUBDIVISION MAP BLOCK LOT 079.92 BUILDING IS TO BE: C NST TYPE ., � USE GROUP
r CONTRACTOR
I REMARKS air seal home to restrict air leakage and weatherstrip doors. Install 4"densly
packed cellulose into wood sided walls. Install 2"rigid board and r-19 FG batt I LICENSE 1069058
to common walls. Install R-19 FG Batts to basement sills. Seal and insulate II [Construction Supervisor 1 8
attic hatch. i ,
I TUPPER CONSTRUCTION CO ,1
ILLC i
_ _ Richard Tupper
AREA(SQ FT) 550,249 920 EST COST($) 2098.00 1 PERMIT FEE($) i35.00 i i
i~o •'546a higgins Crowell rd I
OWNER 'HORGAN DANIEL I['West Yarmouth,MA 02673 i
_.1 BUILDING DEPT BY I
ADDRESS HORGANVCYNTHIA A 15 BRENTWAY DR s i
SOUTH YARMOUTH MA 102664 1914 ' —Y-- PHONE 1
.,
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SID ALK OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPIED UNTIL FINAL INSPECTION HAS
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER: I
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.