HomeMy WebLinkAboutBld-20-003179 -e, tZ//-///
.0 TOWN OF YARMOUTH Building Departmen BUILDING
4 • 44 (508) 398-2231 ext.1261
0 y' PERMIT NO :BLD-20-0031i9N PERMIT
rw,"*" ISSUE DATE 312/03/2019 JOB WEATHER CARD
APPLICANT :HENRY E CASSIDY PERMIT TO r New
AT(LOCATION) 1106 CAPT LOTHROP RD, SOUTH YARMOUTH, M ZONING DISTRICT R-40 Bldg.Type: (Residential
SUBDIVISION MAP BLOCK LOT 077.165 R BUILDING IS TO BE: CONST TYPE 1 IV B USE GROUP R-3
CONTRACTOR
REMARKS Repairs-install insulation in existing house(508-775-1214) a _
1 LICENSE rc-S-100988 ._« '
onstruction Supervisor
HENRY E CASSIDY
HENRY CASSIDY
AREA(SQ FT) 493,360,560. EST COST($) 500.00 ___ [WEST YARMOUTH, MA 02673 I
PERMIT FEE($) 35 00 I
OWNER [CARDER FRANK B JR
BUILDING DEPT BY 6 1
ADDRESS CARDER ELLEN M,49 AUSTIN RD W3
_
SUDBURYMA�� 01776 PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREE Y OR SIDEWAM OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, T SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCD
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MAD
UNTIL FINAL INSPECTION HAS
BEEN MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.