Loading...
HomeMy WebLinkAboutBld-20-001439 (2) 7/ -_ TOWN OF YARMOUTH Building Department / -� Cs (508) 398-2231 ext.1261 BUILDING PERMIT PERMIT NO BLD-20 001439 le tisvt,r il ISSUE DATE 09/13/2019 JOB WEATHER CARD APPLICANT HENRY CASSIDY PERMIT TO New AT(LOCATION) 111 SALT MARSH LN,WEST YARMOUTH,MA 026 ZONING DISTRICT I 1 Bldg.Type: Residential SUBDIVISION MAP BLOCK LOT 1017 133 , BUILDING IS TO BE: CONST TYPE [V B 1 USE GROUP R 3 I CONTRACTOR f REMARKS Repair-Install Insulation(508-775-1214) LICENSE 1153567 ? 'Home Improvement } 1 1CAPE COD INSULATION, INC r HENRYCASSIDY }' — 1,18 REARDON CIRCLE ' AREA(SQ FT) s 398 486 880# EST COST($) ,8500 00 : PERMIT FEE($) 35.00 , SO YARMOUTH, MA 02664 OWNER ,BRADLEY RICHARD L , BUILDING DEPT BY ADDRESS 1BRADLEY DORIS A,831 METHUEN ST 1 !DRACUT MA 01826 5224 I AL PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDE K OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS. OCCUPIED UNTIL FINAL INSPECTION HAS OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE. SCHEDULE POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: I • WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION NOTED ABOVE.