Loading...
HomeMy WebLinkAboutBl-20-002542 ,etnc& 41 Miq W '.y TOWN OF YARMOUTH Building Department BUILDING xit ,4'ro (508)398-2231 ext.1261 PERMIT NO :BLD-20. . -002542 PERMIT ce t 1„r- 4' JOB WEATHER CARD ,,woom ISSUE DATE :11/06/2019 APPLICANT ;Michael Harney • PERMIT TO : Repair • IAT(LOCATION) 46 SEAVIEW AVE,SOUTH YARMOUTH, MA 026 ZONING DISTRICT Bldg.Type: Residential SUBDIVISION MAP BLOCK LOT 033.363 BUILDING IS TO BE: CONST TYPE USE GROUP 1 , REMARKS Repair-Remove 15 windows replace with 15 Andersen 400 series windows CONTRACTOR rip and replace 10 sq white Cedar shingles LICENSE 141530 Home Improvement ! I L 1 MW Harney Construction Inc. , _ _ !Michael Harney 200 N. Main St. il AREA(SQ FT) 341,553,9601 EST COST($) 125000.00 PERMIT FEE($) 100.00 S.Yarmouth, MA 02664 OWNER [PEEKE LAURA BUILDING DEPT BY ADDRESS ,9 VALLEY RD L I ., LEXINGTON MA 02421 4f/Cf,(,/ PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SID ALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS. OCCUPANCY 4)REFER TO DETAILED INSPECTION OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. SCHEDULE POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: I I' WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION NOTED ABOVE.