HomeMy WebLinkAboutBld-20-001132 1/1aae-e(P( I t1
.Y4.0 TOWN OF YARMOUTH Building Department BUILDING
(508) 398-2231 ext.1261
Ak:e kro'
0 � y PERMIT NO BLD-2o 001132 PERMIT
Y Y; ISSUE DATE 10/08/2019 JOB WEATHER CARD
APPLICANT Brien Langill PERMIT TO : Repair
AT(LOCATION) 174 WASHINGTON AVE WEST YARMOUTH, MA ZONING DISTRICT Bldg.Type: Residential
SUBDIVISION MAP BLOCK LOT 1063.74 1 BUILDING IS TO BE: CONST TYPE USE GROUP .i
.,.,.N_....._u..K .,_ ., w _ A mM .._._. .. .. , n_ ,i CONTRACTOR
REMARKS Alteration-Installation of roof mounted photovoltaic solar systems,32 panelsmr w_i
LICENSE 11
1 I I
i i
gy s`
AREA(SQ FT) 1 024 618 32M EST COST($) 122000.00 1 PERMIT FEE($) 1150 00 1 y
OWNER IMCGURK THOMAS
BUILDING DEPT BY
ADDRESS MCGURK DOROTHEA E 74 WASHINGTON 1 9
L.WEST YARMOUTH 1MA :02673 d PHONE g
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SID ALK OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MAD UNTIL FINAL INSPECTION HAS
MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER: I
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.