HomeMy WebLinkAboutBld-20-002213 -e'v 1,0 j 2
. ci '.Y`4, TOWN OF YARMOUTH Building Department BUILDING
4' (508) 398-2231 ext.1261
O 4 PERMIT NO .BLD-20-002213 PERMIT
le FUi"Y, Air.�. ...,.. ....
Sklio,, -. ISSUE DATE 10/22/2019 JOB WEATHER CARD
APPLICANT MIRANDA JOSE O PERMIT TO Repair
AT(LOCATION) k426 WEST YARMOUTH RD,WEST YARMOUTH, ZONING DISTRICT 1 1 Bldg.Type: 1Residential :
SUBDIVISION MAP BLOCK LOT 066.86 1 BUILDING IS TO BE: kCONST TYPE 11 i USE GROUP
1 REMARKS Repair-Replace siding 11 sq,Replacement of 11 windows and 3 doors CONTRACTOR
LICENSE
II
AREA(SQ FT) �I^702,056,520.1 EST COST($) 15200.00 s PERMIT FEE($) 1100.00
OWNER :MIRANDA JOSE O BUILDING DEPT BY
ADDRESS LBEZERRA MARIA Z ALVES 426 WEST YARM IL
1-11-1
WEST YARMOUTH .. . ._MA 02673 ._ . (3/1Gc e,_JGlrl I A `fl PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWOR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MAD UNTIL FINAL INSPECTION HAS
BEEN MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER: I
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.