Loading...
HomeMy WebLinkAboutEngineered Plan - 2019N KEY: 4 EXISTING CONTOUR: - — — - q PROPOSED CONTOUR: ------------- O EXISTING SPOT ELEVATION: 25.5 tiq PROPOSED SPOT ELEVATION: 25.5 Lec TEST HOLE: * GO UTILITY POLE: -O- �Q FENCE LINE: HYDRANT: -� nep�� RETAINING WALL: LOCATION MAP LOT 124 (13,146 SF) ASSESSORS MAP: 88 PARCEL: 270 PLAN BOOK: 192, PAGE: 129 25.0' Zo LEACH AREA DETAIL SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 3 BEDROOMS AT 110 GAL / DAY = 330 GAL / DAY SEPTIC TANK: 330 GAL / DAY x 2 DAYS = 660 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 2 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND (25'x 12.8'x 2' DEEP) SIDE AREA: (25'+ 12.8') x 2 x 2 =151 SF (0.74) = 112 GAL/DAY BOTTOM AREA: 25'x 12.8'= 320 SF (0.74) = 237 GAL/DAY CAPACITY = 349 GAUDAY REQUIRED VARIANCES FROM TITLE FIVE: 1. SECTION 15.211 (1): LEACH AREA TO BE LESS THAN 10' FROM PROPERTY LINE (VARIANCES OF 2'). M19-49 SEPTIC SYSTEM SECTION FOUNDATION _/ I- ELEV. 0 (EXISTING) 1500 GAL SEPTIC TANK TEE SIZES: (TO BE CONFIRMED) INLET: 6" UP 13" DOWN OUTLET: 6" OP, 14" DOWN BED ROOM DECK MAX. C 1/4"per ft COVER (V MIN) V' 95.295.03 ELEV. D -BOX ELEV. 6" OF STONE UNDER OR M CHANICALLY COMPACTED) ELEV, -GAS BAFFLE AT OUTLET TEE TEST HOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. WITNESS: PHIL RENAUD DATE: 10-24-19 PERCOLATION RATE: <2 MIN/IN 2" PEASTONE OR FILTER FABRIC - 3/4" - 1 1/2" DOUBLE WASHED STONE INSPECTION PORT ELEV.= 95.33 X1.1 a °° °°^°°I'II 192.5 4 <-> ELEV. —25'x 12.8' 2 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND (25'x 12.8'x 2' DEEP) THA 97.0 1 ELEV. 0/A HORIZON LOAMY SAND 10YR 4/1 98,8 B HORIZON LOAMY SAND 10YR 5/8 94.3 C HORIZON MEDIUM SAND 2.5Y 7/4 PES RC AT 48" NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4, ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). EXISTING FLOOR PLAN 6 FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL f96G��a0i �BENCHMARKAT OZ'"`�/ r i raw°r 95 RIGHT CORNER Q\G, OF BULKHEAD ELEVATION = 100.98 SITE PLAN LOCATION: y P TERRY �� 5 ����� ,. s f 21 CAPT. CHASE RD., S. YARMOUTH, MA ANN p� jai / "c"dARI� ER N->y�<� I�9CQ�^'J ���:3 PREPARED FOR: 5.1 , ��I, �' �v. KAREN CONNORS 95 ,a Ro.38721 � � ���� CIVI► "; S DATE: 10-28-19 SCALE: 1" = 20' BASS RIVER ENGINEERING THOMAS J. McLEL AN, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 L508-364-9048 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. E:PTIC, SYSTEMA septic', variances. 8, ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS, ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. w.al is required for ins/alterations to 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. dwelling. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE. artment 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE SOLE PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. EXISTING LEACH PIT IS TO BE PUMPED AND REMOVED. Mile 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. f96G��a0i �BENCHMARKAT OZ'"`�/ r i raw°r 95 RIGHT CORNER Q\G, OF BULKHEAD ELEVATION = 100.98 SITE PLAN LOCATION: y P TERRY �� 5 ����� ,. s f 21 CAPT. CHASE RD., S. YARMOUTH, MA ANN p� jai / "c"dARI� ER N->y�<� I�9CQ�^'J ���:3 PREPARED FOR: 5.1 , ��I, �' �v. KAREN CONNORS 95 ,a Ro.38721 � � ���� CIVI► "; S DATE: 10-28-19 SCALE: 1" = 20' BASS RIVER ENGINEERING THOMAS J. McLEL AN, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 L508-364-9048