Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2019- NKEY: EXISTING CONTOUR: - - - - 4 PROPOSED CONTOUR: ............. EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25.5TEST HOLE: -t'�- R0�6UTILITY kKNO POLE:FENCE WHITES PATH LINE: HYDRANT: RETAINING WALL: L LOCUS II LOCATION MAP LOTS 3 & 4 (65,844 SF) ASSESSORS MAP: 110 PARCEL:9 PLAN BOOK: 669, PAGE: 13 M19-29 BENCHMARK AT SURVEYORS NAIL ELEVATION = 100.0 100 EO LEACH AREA DETAIL WHITE'S PATH SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 2,520 SF OFFICE x 75 GAL/DAY/1000 SF =189 GAL / DAY SEPTIC TANK: 189 GAL / DAY x 2 DAYS = 378 GAL USE 1500 GALLON SEPTIC TANK (2 COMPARTMENT TANK) LEACHING AREA: USE 3 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND (33.5'x 12.8'x 2' DEEP) SIDE AREA: (33.5' + 12.8') x 2 x 2 = 185 SF (0.74) = 137 GAL/DAY BOTTOM AREA: 33,5'x 12.8'= 429 SF (0.74) = 317 GAL/DAY CAPACITY= 454 GAL/DAY I = 101.52 �`LR&,O NPR�FORO SEPTIC SYSTEM SECTION HDCI COVERS TO GRADE 99.4 TOP OF CONC. SLAB 1/4" per ft 99,48 98.4 1/4" per ft ELEV. H-20 98.15 500 ELEV, 1000 GAL GAL 1500 GAL 2 COMPARTMENT SEPTIC TANK ((6" OF STONE UNDER OR WIECHANICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN .:j i!tf{xj�kY tj 0 Date 1/4" per It X1.1 ELEV. 97.53 ELEV. D -BOX ELEV. (6" OF STONE UNDER OR \ MECHANICA(LH 20 COMPACTED) ELEV. `GAS BAFFLE AT OUTLET TEE TEST HOLE LOGS ENGINEER: THOMAS MCLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: 7-10-19 PERCOLATION RATE: < 2 MIN/IN 2" PEASTONE OR FILTER FABRIC - 3/4" - 1 1/2" DOUBLE WASHED STONE -INSPECTION PORT (HDCI COVER) r- ELEV.= 98.07 wal .1 ° ° ° ° ° I'll 95.07 4 <-> ELEV, 33.5'x12.8' 311 3 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND 33.5' x 12.8'x 2' DEEP ( -20) (TO BE VENTE ) TH-1 102.0 FILL ELEV. 101.0 B HORIZON LOAMY SAND 10YR 5/8 100.0 C HORIZON MEDIUM SAND 2.5Y 7/4 PERC AT 48" NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST T OF PIPE OUT OF D -BOX TO BE SET LEVEL, 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OFA GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL! CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE SOLE PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY REPRESENT A FULL DETAILED PROPERTY SURVEY. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 15. THIS SEPTIC SYSTEM DESIGN REQUIRES A VARIANCE FROM TITLE FIVE SECTION 15.221 (7): PROPOSED SEPTIC SYSTEM TO BE GREATER THAN T BELOW GRADE, (VARIANCE OF 3" - 21"). 799 D €;: v �� ANN i. ARNE€�- NQ. 38721 >� THOMASJ. CIVIL. 1 r5471 C 6 3 LyJ/U�64L4 �C�\, THOMAS J. SITE PLAN LOCATION: 363 WHITES PATH, S. YARMOUTH,'MA PREPARED FOR: ROBERT B. OUR CO., INC. DATE: 7-11-19 SCALE: 1" = 40' REVISED: 7-15-19 & 7-26-19 (2 COMPARTMENT TANK) BASS RIVER ENGINEERING P E P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048 4t7Ae_ (t4 copy