HomeMy WebLinkAboutEngineered Plan - Rev. 2019.o
0 MINIM=
» » CROSS --SECTION 1
3 4 TO 1-1 2
/ /J
NO.
DATE
DESC.
70Z
SOIL TEST
- .
PIT DATA
VARIANCERE REQUESTS
_
LOCUS
INFORMATIONN
D
.. N
N
BOTT�MO kEVEL «
STABLE BASE �6 MINIMUM
PLAN VIEW
TO THE BOTTOM
OF THE
1=9.2i
0o
D � I
NOT TO SCALE_
F ,
����IV®
« «
DOUBLE WASHED STONE AND SEED 3/4 TO 1-1/2
p I
STONE
SLTL�. V
::
::
I=9.46
ti
TEST PIT
_ HIGH GROUNDWATER COMPUTATION
TP 11
ONSITE SOIL EVALUATION ATI ON
- ,
310 CMR .15.211 MINIMUM SETBACK DISTANCES: A VARIANCE IS REQUESTED TO At1.OW A SOIL
CURRENT OWNER: WAYNE WOLLERMAN
,
OVERLAY DISTRICT- NONE
2,8
GRD. EL.
10.86
BASED ON TP -1 }
I
ABSORPTION SYSTEM TO BE LOCATED 7 .FEET FROM A .PROPERTY UNE IN LIEU OF 10 FEET.
TITLE REFERENCE: DEED 17928-195
NITROGEN SENSITIVE
ZONE: NOT A ZONE 11
LOCUS
L
SHGW EL.
4 2
I DEPTH TO WATER 8.0
A VARIANCE OF 3 FEET- IS .REQUESTED.
-
ULf 01 NO
rn
D «,
Permit va:!J for REPAIR, G 1:7 IiC '.�.ry�
DATE, JULY 24, 2019. MIW-29
D , INDEX WELL.
VARIANCE IS REQUESTED .TO ALLOW A SOIL
310 CMR 15.211 MINIMUM SETBACK DISTANCES: A N
PLAN REFERENCE:. PLAN 82-149
FEMA FLOOD a
sy
I --I 9,q
FILL
A
LOAMY SAND'
1OYR 3/2
B
LOAMY SAND
16YR 5/8
C
M/F SAND
2.5Y,6/4
�y
D 5 FEET FROM A CELLAR 1N LIEU OF 20 FEET. A ZONE DISTRICT: AE ELEV.=11 _ (�
TEST BY. BSC GROUP. INC. WATER LEVEL RANGE ZONE A ABSORPTION SYSTEM TO BE LOCATE 1
REQUESTED. PANEL 25001 CO588J
VARIANCE OF 5 FEET IS REQU MAP: 32 # W
WITNESSED BY. PHIL RENAUD i DEPTH ®.INDEX WELL JULY 23, 2019 '7.66 ASSESSORS
_ 156 PORTION
ti
D MACDONALD SE 4157 ENT - 1.3 AL PARCEL. (PORTION)
OR. TODD ADJUSTMENT _ OW_ -A VERTtC : - _ __
„ LICENSED SOIL EVALUAT � WATER LEVEL 310 CMR 15.212 DEPTH TO GROUNDWATER. A VARIANCE' fS REQUESTED TO ALL
40 MINIMUM LOT. 25,000 S.F..
- MINS./INCH DEPTH TO HIGH WATER 6 .7 SEPARATION FROM GROUNDWATER TO BE 4 FEET IN LIEU OF 5 FEET. A VARIANCE OF 1 FOOT p
PERCOLATION RATE. < 2 / - D
�_ ZONING DISTRICT. R 25 888± S.F. <
CLASS
CLASS 1 I .
IS REQUESTED. `EXISTING LOT -"SIZE. 6,
541E , SETBACKS:. FRONT 30'
- _
:
0.74 GPD/S.F.;L.T.A.R..
SIDE 15
1
REAR 20s _
44 _
LEGEND.
;
60
- ..GENERAL NOTES
UNSUITABLE SERVED Py 4ss
»OF
�_ OB �OR
�,
MATERIALS -
68 _ GROUNDWATER
1. THIS PLAN IS 1NT'ENDED THE PERMITTING AND CONSTRUCTION OF. THE SEWAGE
TO BE REMOVED} � ; ' o� tiN
TE AND ASSOCIATED SITE WORK. BRIAN G
» I ' DISPOSAL SYSTEM �
YERGATIAN -4
80 { a CA
ca
CIVIL
»
ESTIMATED CONFORM TO 310 CMR 15.000
2. ALL CONSTRUCTION METNOpS AND MATERIALS SMALL
No 46206 .
96 PERCOLATION �_ SEASONAL HIGH �� � 9
E YARMOUTH BOARD HEALTH REGULATIONS.F�TEST RANG TER AND YARMJS7EROUNDWA PROPOSED 28 ,X 12 Sa �,F�L-. ..T 114I LEACHINGFIELD _ , SJ E
5 ` RE ARE NO KNOWN O PROPOSED PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE ONAI
� - I(START)=8.8 3. THE
I(END) 8.70 PROPOSED LEACHING. FACILITY.
ALL TOPSOIL. SUBSOIL AND OTHER
4. IF AN OVERDIG IS SPECT l:U. REMOVE !ti G
MATERIALS.
CALCULATIONS
FLOOR PLANS UNSUITABLE
DESIGN _
- ..
BRIAN G YERGATIA DATE
I Lo
T27
'' 5. IF AN OVERDIG IS SPECIFIED, REPLACE ALL EXCAVATED MATERIALS WITHIN THE .LIMIT OF
DESIGN FLOW EXISTING AND PROPOSED
PROFESSIONAL ENGINEER
: EXCAVATION WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC, MATERIAL AND
- � � PROPOSED _DIST'. I AND LAYERS 4F DIFFERENT CLASSES OF SOIL
2 BEDROOMS * 110 GPD / BEDROOM - 220 GPD 12 1 STORY #I4 (1 STORY) DEIFTRlOUS SUBSTANCES MIXTURES
( ) CONCRETE BOUND
j BOX (H-10)
SHALL NOT BE USED. FI L SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 2
REQUIRED SEPTIC TANK - --- I FOUND & HELD I(IN)=9.12
°j _ INCHES. A SIEVE ANALY IS USING A #4 SIEVE SHALL 8E PERFORMED ON A
I OUT -8.95 _ 1S
+ t ) PROPOSED % BY WEIGHT MAY BE RETAINED ON THE
440 GALLONS R2 5
220 GPD X 200% HEN }LITGH>m��i B � `�„� � REPRESENTATIVE SAMPLEI OF FILL.. UP TO 45
BR2 Kt1C u j 1p 1,500 GAL. TANK
USE 1'. 00 GALLON SEPTIC TANK � '� � � 2D E I(IN)=9.46 N86'47'05"E 106.67 #4 SIEVE. SUCH ANALYSES MUST DEMONSTRATE' THAT THE MATERIAL METS EACH OF
I a ,44. , SEPTIC SYSTEM
tJ cs ``.�„ r =9.21 1 cn THE FOLLOWING SPECIFICATIONS:
E OF REQUIRE LEACHING _M iLITY
I(OUT)=9.21
Oct
BATH I co . � . • ° ` . >.a : . . , _�:.,, 10 �
0
LIVING LIVING � � =' .0 REPAIR
M MUST PASS #4 SIEVE
DESIGN PERG. RATE. <2 MIN/INCH „ o � � � 0 , Is;.. �'� •
100%
ROOM ROO,P j a . t _ PASS 50 SIEVE
aR 10 ry_ ,r"'
10% MUST #
LONG TERM APPL f2AiT=: 0.74 GPD/SF BR1 BP1 2 . ``�`�,,.� `•L.�-�...
74 PD SF - 297 SF _. 3 C ¢.. O 20 MUST PASS #100 SE
VE
220 GPD •� 0. G / ii . . ; . � ,...�.. -
0-5%WUST PASS #200 SIEVE
SIZE OF LEACHING FACILITY PROVIDED _ ° s CONCRETE BOUND
I �� . .f-.. •.pe . • , 0 FOUND & HELD APPROXIMATE. THE ENGINEER
. I ..... °��::. ° eh�PLl*x s. EXISTING UTILITIES wHERE,I SHOWN ON THE PLANS AREA Rox DON RUAD
USE A 28 X 12 LEACHING FIELD.
GIS P, Pf�S ,, l' _ DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL SUBSURFACE STRUCTURES ARE
2 HU S
FLOOR PLAN INFORMATION WAS P OVIDED BY
NOTE 0$S (A'TION .�
> - Q Q 17-91) SHOWN. CONTRACTOR SHALL VERIFY THE SIZE, LOCATION AND ELEVATION OF INVERTS .
BOTTOM AREA: 28 X 12 = 336 S.F. OWNER OF THE PROPERTY. PROPOSED 5 :PORT I X 1 .3 c, /'�'�`
OVERDIG _ -GAZEBO L d.� 1 15 TOF=12.1 OF UTILITIES AND STRUCTURES, WITHIN THE LIMIT OF WORK, PRIOR TO THE START OF IN
_ :'
_ TING SYSTEM
EFFECTIVE LEACHING AREA - 336 S.F. EXIS
b
P ENT�S TO BE �� �.t TP --1 '� CONSTRUCTION. IF ANY �{SCREPANCIES ARE DISCOVERED OR FIELD CHANGES
COM a nt R SHALL NO
THE ENGINEER IMMEDIATELY.
I Q� aISPOSED REQUIRED, THE CONTRACTO H YARMOUTH /� p (� TH
336 S.F. X 0.74 GPD/S.F. = 249 GPD (INSTALLED CAPACITY) R MOVED do tl WEST 1 ARM V U
I ACC DANCE WITkf = f BENCH MARK:
249 GPD > 220 ,GPD (29 GPD RESERVE CAPACITY ...PROVIDED) � � � TITLE V f 1 (OUT} -9.97 � ,�� -�•••.,
'�-� TOP OF CONCRETE BOUND i
'� � 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY COORDINATING THE MASSACHUSETTS
r O ELEV. =8.92 (NAND 8$) PROPOSED CONSTRUGTIO ACTIVITIES WITH DIG -SAFE AND. THE APPLICABLE UTILITY
COMPANIES, AND SHALLOMPLETE THE PROPOSED WORK WITHOUT ANY INTERUPTIONS BARNSTABLE COUNTY)
IN SERVICE.
�. {i3ctr1� �St - CONTRACTOR IS REQUIRED TO NOTIFY DIG -SAFE, PER MASS. STATUTE CHAPTER 82,
�j ('� 'j (''� It � `-� � o�� -' I Or• - =12.7. a -� � -
1,500 GALLON
SE[�" TI 1.i TAN H �"� i V cU = It i Fi =13.8 =r 0-
10
SECTION 40 (1-888 3 7233) A MINIMUM OF 72 HOURS PRIOR r0 THE START OF
a
t i O 0
0 .,.
- _ _ o, _ CONSTRUCTION. �- PIAN
a
�, SITE IA
NOT TO SCALE
„ '
THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. INSTALLATION
RAISE AT LEA T ONE EXISTING COVER �� r _. RINDER AT THIS PROPERTY IS NOT ALLOWED PER 310 CMR
NOTES: » � I �� .. ,�. 12.0 OR :USE OF A GARBAGE
TO WITHIN 6 FINISHED GRADE
TIC TANK SHALL BE STEEL REINFORCED CONCRETE. RISER SN LL BE 18 HDPE PIPE 15.240(4}.
1. ' SEP THE R � -
C NK SHALL BE CAPABLE OF WITHSTANDING H-10 �.,� s,� !-+ �,; t,
2. SEPTI TA �. X 11.4 AUGUST 7, 2019
LOADING. CONC. COVER t ;
CONCRETE CONSTRUCTION » t = r
3. ALL PIPE CONNECTIONS AND ON 6 MAX.
SHALL BE WATERTIGHT.
LOCATED 4. TEES SHALL BE SCH. 40 PVC AND SHALL BE L OC ,^ t LC)T22-A
WITHIN 12» OF TANK WALL AND ACCESSIBLE FROM TANK
GRAVEL � �
.,o INSPECTION PORT
COVER.
N07
5. FILL ALL UNUSED KNOCKOUTS
WITH HYDRAULIC CEMENT.
X 1'0 SCALE
» 11.6 S�
10--6 a .. , �. 2�
�. �
•
REVISIONS:
0 MINIM=
» » CROSS --SECTION 1
3 4 TO 1-1 2
/ /J
NO.
DATE
DESC.
1
8/26/19:
RELOCATE S.A.S.
2
9/20/19
PER HEALTH DEPT
CRUSHED STONE
BOTT�MO kEVEL «
STABLE BASE �6 MINIMUM
PLAN VIEW
TO THE BOTTOM
OF THE
1=9.2i
«
4 SCH. 40 PVC
1=8.70
F ,
����IV®
« «
DOUBLE WASHED STONE AND SEED 3/4 TO 1-1/2
p I
STONE
::
::
I=9.46
-
PLAN VIEW
0 MINIM=
» » CROSS --SECTION 1
3 4 TO 1-1 2
/ /J
VIEW
- R
INSPECTION PORTISHALL
O
p
EXTEND
� � �'
349 main Street -Route 28
CRUSHED STONE
BOTT�MO kEVEL «
STABLE BASE �6 MINIMUM
PLAN VIEW
TO THE BOTTOM
OF THE
1=9.2i
«
4 SCH. 40 PVC
1=8.70
F ,
����IV®
« «
DOUBLE WASHED STONE AND SEED 3/4 TO 1-1/2
p I
STONE
::
::
I=9.46
f=9.12 1=8.95
..DOWN
SM SAND AND
YSTE
INTO THE
02673
PERFORATED PIPE.
-
5 OUTLET
_
DISTRIBUTION N BOX DETAIL(H-10
r
'' NATURALLY OCCU
RING PERVIOUS
.r
-
ULf 01 NO
1 4.0 SEPARATION
Permit va:!J for REPAIR, G 1:7 IiC '.�.ry�
;.
508 778 8919
O BOTT OM
E3
SEPTIC TANK
�L4.'LE;
SUBGRADE
f3F4LV, due to State and Local sq;' .1c v� ;.:c
LE ACHING_ FIELD DETAIL-
-
NOT TO SCALE - ,.
�
O
_
DEPT.
.
-
- REMOVABLE
»
6 MAX.
-
HEALTH
NOT TO SCALE
MIN. 2% SLOPE
OVER LEACHING FIELD
OVER
« « a
2 MIN. OF 1/8- TO 1/2 -
/2
DOUBLE WASHED STONE
COVER
_
TYPICAL SYSTEM PROFILE
OF
�Q`j�+,ugssq
PREPARED FOR:
LATERALS
SLOPE LA
HDPE RISER
�`
Noir To SCALE »
40 PVC
-
�° �
KIERAN J a
WAYNE WALLERMAN
12 MIN. COVER
-
�
,• a = -
AT 0.005 FT"/FT
1 3»
2 WALLS
« �
21 '�'"''�
I
4 SCH.
_
. 1
EL 2.7 =0.01
o ..,
0 HEALY N
0 NO. °
18 HUDSON ROAD _
WEST YARMOUTH MA 02673
TOP FOUNDATION
FIRST PIPE LENGTH �,��€P,1STER��
TO BE SET LEVEL
EL.=11.0 a SCH. 40 PVC FOR MIN.
L=1 0± FT. FINISH GRADE
S=0.04EL. 10.5-11.2
e SCH. .40 PVC
x..
EL.=9.35 LEACHING FIELD BSkj
RI' OF I Lt
2« -1 '
- R
� � �'
349 main Street -Route 28
« 4« MIN. LOAM I
3/4 T4 1-1 /2
BOTT�MO kEVEL «
STABLE BASE �6 MINIMUM
PLAN VIEW
=9.97
1=9.2i
I=8.85
1=8.70
West Yarmouth, Massachusetts
« «
DOUBLE WASHED STONE AND SEED 3/4 TO 1-1/2
p I
STONE
::
::
I=9.46
f=9.12 1=8.95
_ 0
EL -8.2 J
02673
CONTAINING NO FINES CRUSHED
-
5 OUTLET
SECjIQN MEW
177111171111111111111
.r
D -BOX
1 4.0 SEPARATION
Permit va:!J for REPAIR, G 1:7 IiC '.�.ry�
;.
508 778 8919
O BOTT OM
E3
SEPTIC TANK
�L4.'LE;
f3F4LV, due to State and Local sq;' .1c v� ;.:c
GEOTEXTILE FABRIC MAY
BE SUBSTITUTED FOR
2» PEASTONE LAYER
5 OVERDtG T
NOTES: EL.=4.2' IoW rd of Health review and approval
FID S Group,Inc.
OF LEACHING FIC 2019 The BSC
v ns/altera3io���,
f -^Yore additions/repo atto
P EXCEEDS 0.08 FT. FT OR
MAGNETIC REFLECTIVE TAPE SHALL BE PROVIDED EST. H GH GROUNDWATER staff
T EOR BAFFLE WHERE SLOPE. OF PIE E % � • n � s/dwclein .
1. PROVIDE lNt..E 7E
sewage facilities and/or structure � ,
IN PUMPED SYSTEM. IN THE TRENCH OVER ALL PVC PIPING
` SCALE: 1" � 20
2. FIRST TWO FEET OF PIPE OUT OF DIST. BOX TO BE LAID LEVEL.
CONCRETE CONSTRUCTION SHALL BE WATERTIGHT. ( Yarc ouBh llt alth t13ISartinetiE
A ONCR
AND G
ALL
PIPE
CONNECTIONS
3.��
t
40 €Ir
I 4: FILL ALL UNUSED KNOCKOUTS WITH MORTAR. I t; s., 0 10 20
.....-� ...\..r., �.... ,ter MA,rr•n -rn URTWIM a IAlfUgrt (1s= 1=1MMI-IM MAnp,
i�i•iit.��:rtiii(�)r.•yly,��� •ry;�yr+
i•f_01
5 OVERDtG T
NOTES: EL.=4.2' IoW rd of Health review and approval
FID S Group,Inc.
OF LEACHING FIC 2019 The BSC
v ns/altera3io���,
f -^Yore additions/repo atto
P EXCEEDS 0.08 FT. FT OR
MAGNETIC REFLECTIVE TAPE SHALL BE PROVIDED EST. H GH GROUNDWATER staff
T EOR BAFFLE WHERE SLOPE. OF PIE E % � • n � s/dwclein .
1. PROVIDE lNt..E 7E
sewage facilities and/or structure � ,
IN PUMPED SYSTEM. IN THE TRENCH OVER ALL PVC PIPING
` SCALE: 1" � 20
2. FIRST TWO FEET OF PIPE OUT OF DIST. BOX TO BE LAID LEVEL.
CONCRETE CONSTRUCTION SHALL BE WATERTIGHT. ( Yarc ouBh llt alth t13ISartinetiE
A ONCR
AND G
ALL
PIPE
CONNECTIONS
3.��
t
40 €Ir
I 4: FILL ALL UNUSED KNOCKOUTS WITH MORTAR. I t; s., 0 10 20
.....-� ...\..r., �.... ,ter MA,rr•n -rn URTWIM a IAlfUgrt (1s= 1=1MMI-IM MAnp,