Loading...
HomeMy WebLinkAboutReview Checklist --9/QC- / TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. ' 2. Lot � Zone of Contribution: In Out( ge '/, • - Commercial: Residential: ,�� ,Street: ,,,,,,e-z,-- Village: . Floor Plan: v #Bedrooms: if- Owner: iif.f,71rl,4G Installer: Aria..4,, . iiL.40 t'isfrig' Address: Phone: An KralM. 17 Phone: Builder: Engineer: �A,' v. / ,1:' /'d L� Address: Phone: T iliiref/ _ d. G Phone: 4,�� /. /-.l (Rip-td /A YES NO 1.Required#of copies received 1....------- 2. - 2.Date of soils exam and percolation test not older than 2 years L..-•"- 3. 4-5 ft of naturally occurring pervious material, above water table �---- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: k....._--- 6. e6.Benchmark indicated and shown-NGVD if near wetlands 1/4_- 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 6 C_. , _ 9.Leaching minimum 100 ft from wetlands Var.: co-- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: L...--- 12. System meets all other setback requirements Var.: C____.-- 13. Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom • - I o - Var.: // .� 15. System not in top or subsoil(A,B horizons) c 5'remov. -------' 16.Proposed contours are suitable co..-- 17. System meets slope requirements-min. 1/8", '/4"preferred L---- 18. System meets breakout requirements PVC liner: !C Got Wall: lid L..-/ 19. Specified tee sizes are proper, gas baffle on outlet tee t✓-- 20. Sewage is under 10,000 gpd for parcel l_/ 21.No garbage disposal (.--� 22. System adequately sized for its intended use L-.--.• 23.Minimum 6"stone or compacted below tank and dbox `.---, • 24.Manhole covers within 6"of grade,pump chamber cover to grade �� 25. Inspection port on plastic chambers/leach field �_-. - 26. Electrical permit for pump chamber/Separate meter for duplexes �,-----** 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 1/4._-• 28. Septic tank/pump chamber to be factory waterproofed ‹D 29.Vent provided if leaching below 3 feet,under driveway/parking 74Al,..,ii `.i 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: �_--• 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater `..� 34.Title V Application and permit fee, installer signature - �---- 35.Foundation footing min.2 feet above adjusted ground water for new house ---®' 36.Deed Restriction required max. #bedrooms: max. flow: gpd ---------- 37. -�� 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03