Loading...
HomeMy WebLinkAbout2019 Nov 15 - Email from Northeast Construction with Installer As-Built /t O2 sr- Cog 5 . Florio, Mary Alice From: marymnec@aol.com Sent: Friday, November 15, 2019 11:10 AM To: Florio, Mary Alice Subject: 241 Willow street as- built Attachments: Kidney Ctr Yarmouth as built for ic. 11-15.pdf X11 ,z t ag �` * r x mi ; fi * ', rte "'� � r i Good Morning, I have attached the as-built the Town was looking for from us, as far as the plumbing end of the project that is being done by Dan-Cel Plumbing who is hired by the Fresenius Medical center I have contacted the project manager and the tie end with the plumber has not been completed yet. Happy Friday! Mary McClain Northeast Construction Septic Systems and Excavation Corp. P.O. Box 2350 32 Sara Ann Lane Brewster, MA 02631 Office: (508) 896-7713 Fax: 1-508-896-8532 1 Town of Yarmouth Subsurface Sewage Disposal System As-Built Information Street Address: e2tII WILLOW 5772k-€T Map: 13 Parcel: Owner Name: 2eSen /uS mP Alcat CARP , 2 Permit /9--94,`BOHDe-M-Z/38o Date Installed: ia 7 / New: • ✓ Repair: Installer Name: Mn tad-heAt - o S 4-n tiC4-te N cep(-tc .Sy 5iec'n,I Installer Phone:154 WC-771 4- 1kxe,avc,4-lgr.1 Coria" Installation of(list all components,both newly installed and existing to remain in use): /(6PC410d ill Syryp6r) q� Jtc&i //-26 % 4 ,5*1 1- 7 Je 6 '01wr►eL. teArd, 64-5a,- 5k,, 6,4-Ssw Z Leach Capacity(gpd): Ground Water Depth(inches): Health Inspection by: • As-built Diagram �- (Print pearly in Black/Blue Ink and Use Straight Edge) 101 rktJ t` � f,08G of tG t, U-L o ac 1,, 4k5�v w�y S1Itr IOoa q,.ti U-z6 A A f')u.ahpa. Copt,A 7G 10t cF L+:rat — -f) NOV 15 2019 Is HEALTH DEPT A B C D 1 3 t �`/, ' E F G 2 / 6// ' 7' 3 - 4 •__� ' s