HomeMy WebLinkAbout2019 Nov 15 - Email from Northeast Construction with Installer As-Built /t O2 sr- Cog 5 .
Florio, Mary Alice
From: marymnec@aol.com
Sent: Friday, November 15, 2019 11:10 AM
To: Florio, Mary Alice
Subject: 241 Willow street as- built
Attachments: Kidney Ctr Yarmouth as built for ic. 11-15.pdf
X11
,z t ag �` * r
x mi ; fi * ', rte "'� � r i
Good Morning,
I have attached the as-built the Town was looking for from us, as far as the plumbing end of the project that is being done
by Dan-Cel Plumbing who is hired by the Fresenius Medical center I have contacted the project manager and the tie end
with the plumber has not been completed yet.
Happy Friday!
Mary McClain
Northeast Construction Septic Systems and Excavation Corp.
P.O. Box 2350
32 Sara Ann Lane
Brewster, MA 02631
Office: (508) 896-7713 Fax: 1-508-896-8532
1
Town of Yarmouth
Subsurface Sewage Disposal System As-Built Information
Street Address: e2tII WILLOW 5772k-€T
Map: 13 Parcel:
Owner Name: 2eSen /uS mP
Alcat CARP , 2 Permit /9--94,`BOHDe-M-Z/38o
Date Installed: ia 7 /
New: • ✓ Repair:
Installer Name: Mn tad-heAt - o S 4-n tiC4-te N cep(-tc .Sy 5iec'n,I Installer Phone:154 WC-771
4- 1kxe,avc,4-lgr.1 Coria"
Installation of(list all components,both newly installed and existing to remain in use):
/(6PC410d ill Syryp6r) q� Jtc&i //-26 % 4 ,5*1
1- 7 Je 6 '01wr►eL. teArd, 64-5a,- 5k,, 6,4-Ssw Z
Leach Capacity(gpd): Ground Water Depth(inches): Health Inspection by:
•
As-built Diagram
�- (Print pearly in Black/Blue Ink and Use Straight Edge) 101 rktJ
t`
� f,08G of tG t, U-L o
ac 1,, 4k5�v w�y S1Itr
IOoa q,.ti U-z6
A
A
f')u.ahpa.
Copt,A 7G
10t cF L+:rat —
-f)
NOV 15 2019
Is
HEALTH DEPT
A B C D
1 3 t �`/, ' E F G
2 / 6// ' 7'
3 -
4 •__�
' s