HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 60 Lot ? Zone of Contribution: In Out /Acreage
Commercial: Residential: f
Street: . 7 , 0, 0- L i ft K.
Village: aztSt y am- Floor Plan: V #Bedrooms:
Owner «ie7 Installer: A'4,-/- 64,/.03- �h�
Address: Phone: 5.0g- _398- c:25 '
Phone:
Builder'. Engineer: pew?
Address: / Phone: •5,N3 3G .- *# 7.-// .
Phone:
N/A YES ' NO
1.Required#of copies received ✓
2.Date of soils exam and percolation test not older than 2 years V
, 3.4-5 ft of naturally occurring pervious material,above water table V7
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: ,/
6.Benchmark indicated and shown=NGVD if near wetlands ✓,
7.Septic tank minimum 10 ft from foundation,deck Var.: V
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: j2./ft, Ver. sir, C)
9.Leaching minimum 100 ft from wetlands Var.: J.
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ./
11.Tank/leaching minimum 10 ft from property line Var.:
12.System meets all other setback requirements Var.: Y
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15.System not in top or subsoil(A,B horizons)or 5'removal
16.Proposed contours are suitable ✓
17. System meets slope requirements-min. 1/8", 1/e"pref • V
18.System meets breakout requirements VC liner: Wall: ,�
19. Specified tee sizes are proper,gas baffle on outlet tee ,/
20.Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox V/
24.Manhole covers within 6"of grade,pump chamber cover to grade ✓
25.Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes V
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size y
28.Septic tank/pump chamber to be factory waterproofed V
29.Vent provided if leaching below 3 feet,under driveway/parking V
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial: ✓
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature .7
33.H-20 loading is subject to vehicular traffic, groundwater ✓ k/
34.Title V Application and permit fee,installer signature
35.Foundation footing min.2 feet above adjusted ground water for new house 17,
36.Deed Restriction required max. #bedrooms: max. flow: gpd V/
37.Check area lots for groundwater/Label groundwater in A essor's Map /
Plan reviewed by: p,ix &l/l 1 1 1 1 L(I t l /03