Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST cc.-- ,�--�� Location: A.M. 3 Loth"1 Zone of Contribution: In Out��Acreage /�� `, Commercial: Residential Street: ? e F � Village: 31r,f rsef Floor Plan: #Bedrooms: ___ Owner: i SSBI J ci Installer: Address: Phone: Phone: :- 11 ' _ i . ...„.iia Builder: Engineer: / if./- ,� �+ Address: Z7.-- Phone: I• -- /f. /' Phone: d -71/1-6"7/ &I-40-137 a ii /t- N/A YES NO�.. 6,444 1.Required# of copies received 2.Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table t...---`- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ��'°' 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: .....------ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: C-:-5 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: \„--- - 13.Uses adjustment for maximum high groundwater Var.: r ,., 14.Leaching set 4-5 ft above adj.water or bottom o st o e Var.: ✓ i 15. System not in top or subsoil(A,B horizons) or 5'remova1- 16.Proposed contours are suitable - --r" 17. System meets slope requirements-min. 1/8", 1/4"preferred 4 k....--' 18. System meets breakout requirements PVC liner: `C U /Wall: t1 19. Specified tee sizes are proper, gas baffle on outlet tee �' 20. Sewage is under 10,000 gpd for parcel l_.,---, 21.No garbage disposal c/ 22. System adequately sized for its intended use L.--' 23.Minimum 6"stone or compacted below tank and dbox ,✓- 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field t.� - 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: %......._----- 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house ....----' _ 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map - ---- Plan reviewed by: ,,, '..,0 6/03/03