Loading...
HomeMy WebLinkAboutDrainage As-Built 'ZIA ? 03 \ ---- !, Pre-existing HDPE leaching , i chambers (shown in gray) rn ------� connected to new system. -/7 ` N ...1(._ 0 --- __ \ 4 14 HDPE leaching chambers , NN ( ��, I___.\_____\) with 2 ft. of stone on sides y --,0 % /_(-----)\—\ _ installed around utilities. I \) >k -- . ...._--,, (\\--- Pre-exist 600 gal. --A � / r,. . ,� basins and 12 inch , ///):;;;;P % ° HDPE pipe. t i, Ilgt \ From catch basin: elbow trap, \,, o �_ - -" __ 90 bend, 3 ft of pipe, 90 bend N--,, BRADDOCK ST. I into HDPE leaching chamber. From catch basin: elbow trap, ----- w ii--Q,�'a\, 14 ft of pipe into pre-existing c:Th,-`� rti`I. ,_) -- HDPE leach chambers. Elbow trap. i t ;i \ \ II ` . i--' II a G All pipe is 12 inch I\ i t 1 0 t ,�� N Vents (typical) p p _ \ \\ L.. diameter HOPE pipe. (ii) \ 5 - E r-'1 °� -" NOTE: High groundwater area. ----�---) } e rl r_,,� New leach chambers in street I \ c are approx. 18 inches deep to i1---- / _ _\ ) 0 çI t top of chambers. Q ,) „DAdded As-built Details RAA RAA C� Dote DESCRIPTION Drown Checked REVISIONS\C New 2-6 ft. dia., 4 ft. deep (600 gal.) . AS--BUILT DRAINAGE precast structures (MH and CB). BREEZY POINT ROAD ATatBRADDOCK STREET All frames and grates and frames IN and covers are 4 inches high. so. YARMOUTH / SCALE: 1" = 40' DATE: MARCH 19, 2007 !J TOWN OF YARMOUTH INSTALLED BY J. W. DUBIS & SONS, INC. ENGINEERING1146ROUTE 2S8ION CONTRACT 07-55-ENG. DRAIN INSTALLED 8/6-8/07 SOUTH YARMOUTH, MA 02664 PROJECT PAVED 8/16-17/07. DRAWN BY: RAA CHECKED 7 0 2 8— 2 CHECKED BY: RAA SHEET 1 OF 1