Loading...
Engineered Plan - 2000- BENCH MARK: TOP OF FND. ELE.= 9.9 7.90 10' MIN. 2% 13' 7.64 MANHOLE COVERS TO EXTEND TO WITHIN 6" OF FINISH GRADE GAS DAFFLE REQ' D 2" MIN. 11.40% (H20 DBOX) 1.0% w 7.39 D. B. ~ NEW - 6.82 6.65 1,500 GAL. 6" C USHED NONE_ 5 6 6" CRUSHED STONE 4.( SOIL TEST LOG PERC ' RATE= < 2 Min/Inch DEPTH ELEV.=8.3 - 0" 6)p — A LOAMY SAND 1 OYR 5/1 20" B LOAMY SAND 10YR 5/6 PERC BOTTOM 6.63 @ 34" C FINE SAND 10YR 8/1 120" 1-1.7 SOIL TEST CONDUCTED ON 12/18/99 BY HUNTER ENGINEERING ASSOC. WITNESSED BY:)�KELDA GORMAN., AGENT YARMOUTH HEALTH DEPT. 20' MIN. PROPOSED SEPTIC SYSTEM NO SCALE (SAS) SHALL LA. 3.3.50' LONG (H20 L C FOR SAS REQ'D) G2.8�E` DE � d.nli\� _ r'�,r. ,�_�.. -=_,.et,;w-n �.K- .tet:.:,;,. x..:�`•o� 2" PEASTONE TOPPING 6.60 '��'� �] C� Cl C� "4' NO BREAKOUT �� �. o o ���C=�� ELEV. = 7.10' � �o i w / SOUTH STREET / STREET W1N,D MILL LOCUS MAP STREET LOCUS i GEN RAL NOTES: 4' —! 25.5' -- 4' - — ELEVA1IONS SHOWN BASED ON N.G.V.D. DATUM. 3/4" DOUBLE WASHED STONE SYSTEM PIPE SHALL BE EITHER C.I. OR U`:>E 3 CONCRETE GALLEYS. ALL AROUND I SCHFOULE 40 P.V.C. W/4" 0, S I ONE @ SIDES — THE BOARD OF HEALTH SHALL BE NOTIFIED & 4' OF SITONE @ ENDS PRIOR TO BACHFI LI 'G OF SEPTIC SYSTEV. (EAG,', i GALLEY IS 500 GALLGNHALI BE CAPABLE OF WITHSTANDING A ) — SEI-'? IC SYSTEM STRUCTURAL COMPONENTS S M.H.W.-0.0, BAY VIEW STONE n _ 80.0' _ S E%' !klAL L ELEV OP WALL =7 6 w f 2!. ul O b NO WATER OBSERVED @ 120" -� LEGEND: EXISTING CONTOUR WATER METER W. M. WATER SERVICE W ---W TEST HOLE GAS SERVICE G G NOTE: CONTRACTOR :SHALL PUMPOUT EXISTING CESSPOOLS AND BACKFILL WITH CLEAN MEDIUM SAND REQUESTED VARIANCES: 1) REQUEST 3' VARIANCE FOR SEPARATION (SAS) AND FOUNDATION M• t r a.',p ,AAA2) gF-Q u E_,zT. A 30 JOHN V A�kAv'4s ,��� �� R098 B. y ' o� HUNTER CP_ pp SYKES CIVIL y �'E IOvJ�1 OT3�4i8 H! 0 9No.36445a Z4 L AtAb SCT o� 1o�,' 70' BUFFER ZONE TO TOP OF SEAWALL 70' BUFFER ZONE TO TOP OF BANK j 0 70' X 3' 3' r 2 STY. W/F 0 0 4 BEDROOM DWELLING 3• SILL EL= 9.9 10' 10, 7 3 '�f?tjSf�T`� 5 AREA 100.0' WINDMILL OF WETLAND 4 70' BUFFER ZONE TO TOP OF SEAWALL NO BREAKOUT 015' 70' BUFFER ZONE TO TOP OF BANK LAN E BANK BO it H-10 LOADING, UNLESS SPECT IED OTHWISE. — SEPTIC SYS"EM UNDER DRIVEWAYS SHALL COMPLY WITH A H-20 LOADING. — THE DESIGN AND COMPONENTS OF THE SEPTIC � VC --r[ k n OU A, I RF 1► j Cod .j I I A.N'r P- WI? H TNS J t STATE OF MASSACHUSETTS S;qI�� �.jR'r CODE TITLE V, AND SHALL BE IN COMPLIANCE WITH THE LOCAL BOARD OF HEALTH RULES AND REGULATIONS. SHALL BF_ RESPONSIBLE FOR Ji.Al:lJiV til ALL UiVI_ 'SHALL NOTIFY DIG- 'NKI(W IU CONSTRUCTION. - NO CARBAGE GRINDER GENERA NO -IES:! DESIGN FLOW 4 BEDROOMS AT 110 G.P.B. /DAY 440 G.P.D. REQUIRED SEPTIC TANK: USE MINIMUM 1,500 GAL. SEP1 IC TANK PROVIDED 1,500 GAL. SIZE OF LEACHING FACILITY, REQUIRED: 440/0.74=595 S.F. DESIGN PERC. RATE < 2 MIN./INCH SIDEWALL:(2)(2)(33.50)+(12.83)(2)(2) = 185.32 S.F. BOTTOM: (12.83)(33.50)= 429.81 S.F. 429.81 S.F. + 185.32 S.F.:= 615.12 >595 S.F. SIZE OF LEACHING FACILITY PROVIDED: EFFECTIVE DEPTH: 2' EFFECTIVE LENGTH: 33.5' 0IV EFFECTIVE WIDTH: 12.83' APR 10 2000 - - HALTy De 2� OF I �-tEA CONSULTING ENGINEERS 7 WEEKS POND DRIVE SANDWICH, MA 02601 (508) 477-8268 Hunter Engineering Associates, inc. PROJECT: SEPTIC SYSTEM FOR #11 WINDMILL LANE, WEST- YARMOUTH MA SCALE: 13X2 0' DRAWN BY: J. P. H, DATE: 2/3/00 NEW MAP 020 / PARCEL 52 REMSED BY: OWNER: PHYLLIS TIMMINS 11 WINDMILL LANE `WEST YARMOUTH, MA FILE: REVISED 3/20/00