Loading...
HomeMy WebLinkAboutBld-20-002188 QAPAW 12a ID b O. TOWN OF YARMOUTH Building Department BUILDING „ , 'r (508) 398-2231 ext.1261 0 PERMIT NO 'BLD-20-002188 : PERMIT i, ,00#4,; " ISSUE DATE 10/30/2019 JOB WEATHER CARD APPLICANT Vivint Solar Developer LLC PERMIT TO : Repair IAT(LOCATION) [27 MCGEE ST,WEST YARMOUTH, MA 02673 1 ZONING DISTRICT a Bldg.Type: Residential J SUBDIVISION MAP BLOCK LOT 031114 BUILDING IS TO BE: CONST TYPE1 USE GROUP r -11 _ . REMARKS Repair-Installation of roof mounted photovoltaic solar systems,30 panels CONTRACTOR ,_ �. rICENSE 3 1 , m .� :. ._a_� m---. , 4 _ I ! AREA(SQ FT) ,341,553 960.1 EST COST($) i21120.00 PERMIT FEE($) 150.00 t s OWNER MORAN JUDITH HELEN BUILDING DEPT BY ADDRESS ,27 MCGEE ST , WEST YARMOUTH MA 02673 _ PHONE _ :THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS. OCCUPANCY 4)REFER TO DETAILED INSPECTION OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. SCHEDULE POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: I WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION NOTED ABOVE.