Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH Z -, • SEWAGE PLANRIWIEW CHECKLIST ijZx 7)- `" � •,r Location: A.M. f c Lot 21,, 2- Zone of Contribution: In Mut Ac � --` CryG Commercial: Residential: L/�� Street: 60 St, Village: 1 ' 4`, Floor Plan: #Bedrooms: 0 Owner: (.fir eriir . hal/7 7 Installer: / /-1,4W( C4 i f Address: Phone: 5-Arc-a( Phone: /,n Builder: Engineer: ( Ok174" Address: Phone: ��}^G - 1`-77 13 Phone: i ' t i2L N/A YES NO 1.Required#of copies received c-----' 2.Date of soils exam and percolation test not older than 2 years L- '- 3.4-5 /3.4-5 ft of naturally occurring pervious material,above water table �i> 4.Foundation 2 ft above high point of road H.P.:. Fnd: Var.: 6..42,"- I 5.Water line 10 ft from septic components Var.: L.----- 6. ./6.Benchmark indicated and shown-NGVD if near wetlands IL-- 7.Septic tank minimum 10 ft from foundation,deck Var.: 1.. --- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab .Var.: 9.Leaching minimum 100 ft from wetlands Var.: ' L.---" 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: �- 11.Tank/leaching minimum 10 ft from property line Var.: L.----- 12.System meets all other setback requirements Var.: �--- 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or botto of test Var.: c---- 15.System not in top or subsoil(A,B horizons) 'rem 16.Proposedcontours are suitable c/ 17.System meets slope requirements-min. 1/8", 'A"preferred t. 18. System meets breakout requirements PVC liner: Wall: �.i Y 19. Specified tee sizes are proper,gas baffle on outlet tee - j 20. Sewage is under 10,000 gpd for parcel L.---- 21.No garbage disposal c----- . 22.System adequately sized for its intended use 1/4....--- 23. .. ---23.Minimum 6"stone or compacted below tank and dbox ,--- 24.Manhole covers within 6"of grade,pump chamber cover to grade .._____..--- 25. �25.Inspection port on plastic chambers/leach field �- 26.Electrical permit for pump chamber/Separate meter for duplexes ---- 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size .._...---- 28. 28.Septic tank/pump chamber to be factory waterproofed -_..--, 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater ___.--- 34.Title V Application and permit fee, installer signature ____.---- 35.Foundation footing min.2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd ---- 37. - '37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 4 6/03/03