HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH Z -,
• SEWAGE PLANRIWIEW CHECKLIST ijZx 7)- `" � •,r
Location: A.M. f c Lot 21,, 2- Zone of Contribution: In Mut Ac � --` CryG
Commercial: Residential: L/��
Street: 60 St,
Village: 1 ' 4`, Floor Plan: #Bedrooms: 0
Owner: (.fir eriir . hal/7 7 Installer: / /-1,4W( C4 i f
Address:
Phone: 5-Arc-a(
Phone: /,n
Builder: Engineer: ( Ok174"
Address: Phone: ��}^G - 1`-77 13
Phone: i ' t
i2L
N/A YES NO
1.Required#of copies received c-----'
2.Date of soils exam and percolation test not older than 2 years L- '-
3.4-5
/3.4-5 ft of naturally occurring pervious material,above water table �i>
4.Foundation 2 ft above high point of road H.P.:. Fnd: Var.: 6..42,"- I
5.Water line 10 ft from septic components Var.: L.-----
6.
./6.Benchmark indicated and shown-NGVD if near wetlands IL--
7.Septic tank minimum 10 ft from foundation,deck Var.: 1.. ---
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab .Var.:
9.Leaching minimum 100 ft from wetlands Var.: ' L.---"
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: �-
11.Tank/leaching minimum 10 ft from property line Var.: L.-----
12.System meets all other setback requirements Var.: �---
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj.water or botto of test Var.: c----
15.System not in top or subsoil(A,B horizons) 'rem
16.Proposedcontours are suitable c/
17.System meets slope requirements-min. 1/8", 'A"preferred t.
18. System meets breakout requirements PVC liner: Wall: �.i
Y
19. Specified tee sizes are proper,gas baffle on outlet tee -
j 20. Sewage is under 10,000 gpd for parcel L.----
21.No garbage disposal c-----
. 22.System adequately sized for its intended use 1/4....---
23.
.. ---23.Minimum 6"stone or compacted below tank and dbox ,---
24.Manhole covers within 6"of grade,pump chamber cover to grade .._____..---
25.
�25.Inspection port on plastic chambers/leach field �-
26.Electrical permit for pump chamber/Separate meter for duplexes ----
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size .._...----
28.
28.Septic tank/pump chamber to be factory waterproofed -_..--,
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic,groundwater ___.---
34.Title V Application and permit fee, installer signature ____.----
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd ----
37.
- '37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 4 6/03/03