Loading...
HomeMy WebLinkAboutBld-20-003825 - " ' BUILDING TOWN OF YARMOUTH Budding Department •: (508)398-2231 ext.1261 �`�' PERMIT °� 4 „ ` PERMIT NO BLD-20-003825° JOB WEATHER CARD "w " " F ' ISSUE DATE 01/15/2020 APPLICANT Matthew Hunter PERMIT TO Repair AT(LOCATION) 88 CONSTANCE AVE,WEST YARMOUTH MA 0 I ZONING DISTRICT Bldg.Type: 'Residential I SUBDIVISION MAP BLOCK LOT [086,72 M _ j BUILDING IS TO BE: CONST TYPE L i USE GROUP L f CONTRACTOR REMARKS Installation of one vinyl double hung replacement window.The window ' header size will not change. I LICENSE CSSL-100160 6 ;Construction Supervisor 11 1 1 ALUM PRODUCTS OF CAPE COD 1 ( Stephen Hunter } _. — ,,476 Main Street € AREA(SQ FT) 11,024,618,321 EST COST($) 700 00 i PERMIT FEE($) I50 00 ,3 '; port,z Dennisi MA 02639 P: OWNER PATEL BHADRESH K BUILDING DEPT BY ADDRESS 'PATEL SEJAL B,88 CONSTANCE AVE WEST YARMOUTH mm )MAJ02673 N«`hyPo tl' 7 y 2e00s PHONE .,,. .. THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS. OCCUPIED UNTIL FINAL INSPECTION HAS OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE. SCHEDULE POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION NOTED ABOVE.