HomeMy WebLinkAboutBld-20-003825 - " ' BUILDING
TOWN OF YARMOUTH Budding Department
•: (508)398-2231 ext.1261
�`�' PERMIT
°� 4 „ ` PERMIT NO BLD-20-003825° JOB WEATHER CARD
"w " " F ' ISSUE DATE 01/15/2020
APPLICANT Matthew Hunter PERMIT TO Repair
AT(LOCATION) 88 CONSTANCE AVE,WEST YARMOUTH MA 0 I ZONING DISTRICT Bldg.Type: 'Residential I
SUBDIVISION MAP BLOCK LOT [086,72 M _ j BUILDING IS TO BE: CONST TYPE L i USE GROUP L f
CONTRACTOR
REMARKS Installation of one vinyl double hung replacement window.The window '
header size will not change. I LICENSE CSSL-100160
6 ;Construction Supervisor 11
1
1 ALUM PRODUCTS OF CAPE COD 1
( Stephen Hunter }
_. — ,,476 Main Street €
AREA(SQ FT) 11,024,618,321 EST COST($) 700 00 i PERMIT FEE($) I50 00 ,3 '; port,z Dennisi MA 02639 P:
OWNER PATEL BHADRESH K BUILDING DEPT BY
ADDRESS 'PATEL SEJAL B,88 CONSTANCE AVE
WEST YARMOUTH mm )MAJ02673 N«`hyPo tl' 7 y 2e00s PHONE .,,. ..
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPIED UNTIL FINAL INSPECTION HAS
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.