Loading...
HomeMy WebLinkAboutBld-20-003298 -€A' iec/ .+ 17.) c�` .Yel . TOWN OF YARMOUTH Building (508 398-2231 Deexpartment BUILDING 0 i c :. ..... ....... 8... . . PERMIT O , PERMIT NO .BLD 20 00329 . ........................ JOB WEATHER CARD ,� ISSUE DATE :12/17/2019 ki iv- APPLICANT ITUPPER CONSTRUCTION CO 1 PERMIT TO : Repair AT(LOCATION) 16 FORTUNE RD,YARMOUTH PORT, MA 02675 1 ZONING DISTRICT 1 Bldg.Type: Iesidential SUBDIVISION MAP BLOCK LOT 123 116 w BUILDING IS TO BE: [CONST TYPE µ USE GROUP �. ,___._.. ...N...� ., .....,...,�.,.�........,.,-wH..w...,.._...__.�.,..,..w.,...,..w N��._r,.,M .._......._,�.. __.,.�.... 1 CONTRACTOR REMARKS Repair-Install R-38 FG and R-22 cellulose to open attic space,install R-19 4 along basement sills,air seal home to restrict air leakage,wether strip door, LICENSE 1069058 1 I Construction Supervisor 2 LI TUPPER CONSTRUCTION CO , LLC 1 ..,....o-......w...�..q...�.w,A .bwe ..w.....b... .. _ .,..x... `"�."�- --- �.`. _ � �� .,-.,v. ,2,� -, !Richard Tupper 11 AREA(SQ FT) 436,427,640.1 EST COST($) , 090.00 PERMIT FEE $) 35.000 546a higgins Crowell rd ; ON T P IWest Yarmouth, MA 02673 OWNER OTTOSON STEPHEN J 3 • �. . m _ w__ , mmV --' BUILDING DEPT BY ADDRESS OTTOSON ANNE E 18 SPRING ST FSHREWSBURY 71MMA 01545-235 ,a/a...d2ritaqONE R THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWAL4 OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS. OCCUPIED UNTIL FINAL INSPECTION HAS OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE. SCHEDULE POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: I WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION NOTED ABOVE.