HomeMy WebLinkAboutBld-20-004054 Bu`�t id'n'ue ar�ment
I i id-31c3t)
» q TOWN OF YARMOUTH g p BUILDING
.. (508) 398-2231 ext.1261
t'� • +~ PERMIT NO BLD-20-004064 PERMIT
.44 , , S ISSUE DATE 01/23/2020 JOB WEATHER CARD
APPLICANT :FRANCIS SHEEHAN PERMIT TO : New
AT(LOCATION) 14 LEXINGTON LN,YARMOUTH, MA 02675 i ZONING DISTRICT sR 40 ) Bldg.Type: !Residential
SUBDIVISION MAP BLOCK LOT 116.89 1 BUILDING IS TO BE: CONST TYPE V B USE GROUP R-3
CONTRACTOR
REMARKS Repair-Install Insulation(774-237-0410)
t LICENSE 160854 €!
Home Improvement 11
C !FRONTIER ENERGY SOLUTIONS `s
!FRANCIS SHEEHAN
I wl ,;502 HARWICH RD
AREA(SQ FT) 436,427,640, EST COST($) 4400 00 i PERMIT FEE($) i35 00 ; 11
_ry I[BREWSTER MA 02631nv <
OWNER INILSSON GEORGE W I "
BUILDING DEPT BY
ADDRESSNILSSON JEAN M,2 PINE ST I _ l
£BOYLSTON µ MA01505 i
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDE ALK OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPIED UNTIL FINAL INSPECTION HAS
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER: J
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.