Loading...
HomeMy WebLinkAboutBld-20-003476 -/ . // P »6 ."Y4,,,; TOWN OF YARMOUTH Building Department ` 4 (508) 398-2231 ext.1261 BUILDING 0 p � PERMIT NO :BLD-20-003476 PERMIT ,, ,� ;. ISSUE DATE 12/19/2019 JOB WEATHER CARD .,.,...•., .. . t - APPLICANT Paul Downing PERMIT TO .Repair AT(LOCATION) 111 NOBBY LN WEST YARMOUTH, MA 02673 I ZONING DISTRICT j Bldg.Type: Residential I SUBDIVISION MAP BLOCK LOT 039.250 1 BUILDING IS TO BE: CONST TYPE I USE GROUP 1 F REMARKS Repair-Direct replacement of back patio door with no structural changes CONTRACTOR YmMMJ%^4M40w LICENSE 191634 11 1 IHome Improvement ,4 / 1 DAVOS CONTRACTING i L • _ 11 1 i$Paul Downing 1 AREA(SQ FT) 379,494,720. EST COST($) 1346.00 PERMIT FEE($) 50.00 1749 CENTRAL ST ate 1Stoughton, MA 02072 2 OWNER RICKER ROBERT V i - -J [ BUILDING DEPT BY ADDRESS 443 MANNING ST W JEFFERSON MA 01522 —1Lif ,PHONEM THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWA K OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS. OCCUPANCY 4)REFER TO DETAILED INSPECTION OCCUPIED UNTIL FINAL INSPECTION HAS SCHEDULE BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION NOTED ABOVE.