HomeMy WebLinkAboutBld-20-003942 .. -0 mccaut //
/A7
041" L, ., TOWN OF YARMOUTH Building Department BUILDING
y,,6 ' (508) 398-2231 ext.1261
,. . PERMIT NO BLD-20-003942
le PERMIT
„ r, '' , ` JOB WEATHER CARD
ISSUE DATE 01/17/2020
APPLICANT :Henry E Cassidy PERMIT TO Repair
AT(LOCATION) 43 PAYSON PATH,WEST YARMOUTH MA 0267m ZONING DISTRICT I Bldg.Type: (Residential RY Pp
SUBDIVISION MAP BLOCK LOT [636.119 z BUILDING IS TO BE: kCONST TYPE s I USE GROUP
CONTRACTOR
[REMARKS Repair-Insulation/Weatherization
LICENSE 153567 ti
zHome Improvement 11
CAPE COD INSULATION, INC
!HENRY CASSIDY
_ ..,. �_w 18 REARDON CIRCLE 11
AREA(SQ FT) 436,427 6404 EST COST($) 1625 00 PERMIT FEE($) 1135.00 =S0 YARMOUTH, MA 02664
OWNER MURRAY MARILYN
t BUILDING DEPT BY
ADDRESS ;,43 PAYSON PATH i
WEST YARMOUTH IM 's A [02673 ` v"� /4 PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPIED UNTIL FINAL INSPECTION HAS
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER: J
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.