Loading...
HomeMy WebLinkAboutBlds-19-007077 '-' p/U 0,0139 ,r}Y4 TOWN OF YARMOUTH Building Department BUILDING ,„4_, (508) 398-2231 ext.1261 . 4 D........ PERMIT ' ""* '� � � PERMIT NO :BEDS-19-007077 kA A . "I. '''` "'•""' "'�ISSUE DATE 06/18/2019 JOB WEATHER CARD r- APPLICANT :Plymouth Sign Co. PERMIT TO AT(LOCATION) 573 ROUTE 28,WEST YARMOUTH, MA 02673 ZONING DISTRICT Bldg.Type: Permanent . SUBDIVISION MAP BLOCK LOT 031.133 BUILDING IS TO BE: CONST TYPE . j USE GROUP .. 1-,�-.- ,_ CONTRACTOR . REMARKS Permanent Sign Mariner Resort 4 x 6 (508-398-2721) I LICENSE ry 1 _ JI AREA(SQ FT) 15,218 052,401 EST COST($) .m PERMIT FEE($) 40.00 OWNER [THE MARINER MOTOR LODGE LLC IBUILDING DEPT BY ADDRESS ,573 ROUTE 28 _ WEST YARMOUTH jMA 02673 ONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDE OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS. OCCUPIED UNTIL FINAL INSPECTION HAS OCCUPANCY 4) BEENMADE. TO DETAILED INSPECTION BEEN MADE. SCHEDULE POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: I WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION NOTED ABOVE.