HomeMy WebLinkAboutBld-19-005776 '" Sao/g
il.Y4i .. TOWN OF YARMOUTH Building Department BUILDING
'. (508) 398-2231 ext.1261
}
O 4 PERMIT NO B,LD 19 005776 PERMIT
,. r, �„ a . JOB WEATHER CARD
ISSUE DATE 04/16/2019
APPLICANT ANATOLI SIVITSKI PERMIT TO Repair
r
AT(LOCATION) 24 SCALLOP RD WEST YARMOUTH MA 02673 i ZONING DISTRICT IR 25 I Bldg.Type: Residential
SUBDIVISION MAP BLOCK LOT I014.27 ( BUILDING IS TO BE: ICONST TYPE 1 lV B I USE GROUP ,R 3
.. _._ ,.,._ ... I CONTRACTOR
REMARKS Repair:Strip and re roof 10 sq ft (508-469-0102) I , ,„ �..,,.., �.m
f LICENSE (168043
•
Home Improvement
I'CAPE COD HOME IMPROVEMENT,
I LLC.
AREA(SQ FT) 1 612 852 56: EST COST($) `3940 00 PERMIT FEE($) 150.00 s ?;ANATOLI SIVITSKI ;'
-- -�- '
L 27 MILL POND RD I
OWNER ICHLECK JOURNEY S END CORP jWEST YARMOUTH,MA 02673 I
..� 77 BUILDING DEPT BY
ADDRESS I,254 VILLAGE BLVD 4103 [ 5
TEQUESTA FL 33469 PHONE !
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWAL OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER: 1
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARnvF