Loading...
HomeMy WebLinkAboutBld-20-003989 e; I UtU 1 Z ( 2D � ,q TOWN OF YARMOUTH Building Department BUILDING ,,,4 _ '' (508) 398-2231 ext.1261 0 " ,:t:it PERMIT NO BLD 20 003989 PERMIT �+� JOB WEATHER CARD �.4,0601� ISSUE DATE 01/27/2020 APPLICANT Vivint Solar PERMIT TO Repair AT(LOCATION) 14 SHADY REST DR SOUTH YARMOUTH,MA 02 i ZONING DISTRICT ( Bldg.Type: 11Residential , SUBDIVISION MAP BLOCK LOT 1088.101 I BUILDING IS TO BE: ICONST TYPE €o j USE GROUP 1 € € CONTRACTOR # 11 REMARKS Installation of roof mounted photovoltaic solar systems 15.68 49 Panels ; LICENSE I"..�._ _,... �. .. 1 3 AREA(SQ FT) 1 455 376 240 EST COST($) 134496.00 N PERMIT FEE($) /150 00 OWNER IMEHROTRA RAJIV BUILDING DEPT BY ADDRESS MEHROTRA MALA,6252 CEDAR CREEK WA € 1 [FARMINGTON NY 14425 ,.I :f l�& )JJ _PHONE_ L.. THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS. OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MAD UNTIL FINAL INSPECTION HAS BEEN MADE. SCHEDULE POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: I WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS SIX MONTHS OF DATE THE.PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION NOTED ABOVE.