HomeMy WebLinkAboutBld-20-002275 w tadit i D(30)
" '`��R TOWN OF YARMOUTH Building Department BUILDING
(508) 398-2231 ext.1261
14%, PERMIT
0 ,,, 4it'yt�0 PERMIT NO BLD-20-002275
'4; „ , ' JOB WEATHER CARD
. ISSUE DATE 10/30/2019
-• APPLICANT •Kaila O'Farrell • PERMIT TO Repair
AT(LOCATION) 110 SPINNING BROOK RD SOUTH YARMOUTH ZONING DISTRICT t _ Bldg.Type: Residential m WN
SUBDIVISION MAP BLOCK LOT 8 198 Y J BUILDING IS TO BE: CONST TYPE S i USE GROUP [ _ m KK {
REMARKS Weatherization,Air sealing,weather stripping,and Insulation .--1
CONTRACTOR
AC_„ ,.__
I € LICENSE
i i
AREA(SQ FT) [531,301,320 EST COST($) 3 30_6 72 I PERMIT FEE($) [35.00 I 1
OWNER IHINCKLEY MARTHA A
IN - .- BUILDING DEPT BY ;a I
ADDRESS 1, 10 SPINNING BROOK RD
[-SOUTH YARMOUTH 9MA 102664 1 PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPIED UNTIL FINAL INSPECTION HAS
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER: I
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.