Loading...
HomeMy WebLinkAboutBld-20-002275 w tadit i D(30) " '`��R TOWN OF YARMOUTH Building Department BUILDING (508) 398-2231 ext.1261 14%, PERMIT 0 ,,, 4it'yt�0 PERMIT NO BLD-20-002275 '4; „ , ' JOB WEATHER CARD . ISSUE DATE 10/30/2019 -• APPLICANT •Kaila O'Farrell • PERMIT TO Repair AT(LOCATION) 110 SPINNING BROOK RD SOUTH YARMOUTH ZONING DISTRICT t _ Bldg.Type: Residential m WN SUBDIVISION MAP BLOCK LOT 8 198 Y J BUILDING IS TO BE: CONST TYPE S i USE GROUP [ _ m KK { REMARKS Weatherization,Air sealing,weather stripping,and Insulation .--1 CONTRACTOR AC_„ ,.__ I € LICENSE i i AREA(SQ FT) [531,301,320 EST COST($) 3 30_6 72 I PERMIT FEE($) [35.00 I 1 OWNER IHINCKLEY MARTHA A IN - .- BUILDING DEPT BY ;a I ADDRESS 1, 10 SPINNING BROOK RD [-SOUTH YARMOUTH 9MA 102664 1 PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS. OCCUPIED UNTIL FINAL INSPECTION HAS OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE. SCHEDULE POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS OTHER: I WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION NOTED ABOVE.