HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
+ SEWAGE PLAN REVIEW CHECKLIST
'4, Location: A.M. 6 Lot I Zone of Contribution: In Out P Acreage
Q Commercial: Residential:
Street: S 0 ,d �/.
Village: %�G Floor Plan: # Bedrooms:
r� � 3
Owner: l!�la,' 7 /moi �� C Installer: 12)
Address: // Phone:
Phone:
Builder: 7 Engineer: g. cee,e6�Address: Phone: 7 5_,9.? ..
Phone: r &% / iSx-� &letear /
N/A YES _,NO
1.Required#of copies received �✓
2. Date of soils exam and percolation test not older than 2 years L......---
3.4-5
.,.---3.4-5 ft of naturally occurring pervious material,above water table ,...----
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: `�-
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands %....---
7. Septic tank minimum 10 ft from foundation,deck Var.: l.,-----`
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: l.�
9.Leaching minimum 100 ft from wetlands Var.: L..
10. Leaching minimum 150 ft from drinking weH/25 ft irrigation well Var.: ...---,
11. Tank/leaching minimum 10 ft from property line Var.: �.
12. System meets all other setback requirements Var.: �---..'
13.Uses adjustment for maximum high groundwater Var.: L f
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ��
15. System not in top or subsoil(A,B horizons)or 5' removal U.�
16.Proposed contours are suitable '
17. System meets slope requirements-min. 1/8", '/."preferred L./".
18. System meets breakout requirements PVC liner: Wall: k-----""
19. Specified tee sizes are proper, gas baffle on outlet tee L/
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal er-1--.. --)
22. System adequately sized for its intended use L-----
1 23. Minimum 6"stone or compacted below tank and dbox `/
24.Manhole covers within 6"of grade,pump chamber cover to grade l _.---
25.
25.Inspection port on plastic chambers/leach field L-----
26.
/26. Electrical permit for pump chamber/Separate meter for duplexes L!-
27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size L,/
28. Septic tank/pump chamber to be factory waterproofed 4,----
29.
,/29. Vent provided if leaching below 3 feet, under driveway/parking ;r/
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: ,
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
4.--------
33. H-20 loading is subject to vehicular traffic, groundwater `�
34. Title V Application and permit fee, installer signature ( �,
35. Foundation footing min. 2 feet above adjusted ground water for new house �- �-/
36. Deed Restriction required max. #bedrooms: max. flow: gpd L__-----
37. Check area lots for groundwater/Label groundwater in Assessor's Map c/-
Plan reviewed by: 6/03/03