HomeMy WebLinkAboutReview Checklist 9/5 ° Za °1-- TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
„----
Location:
Location: A.M. & Lot -7:5 Zone of Contribution: In Out Acreage
Commercial: Residential. ��
Street: . / cY,a/,,k. 6,, ,,,6Q7,
Village: hr's/ ��,7� `j - / Floor Plan: ,, #Bedrooms: ,�j
Owner: 3-2;4-, , '/D) .7-e) Installer: / -=,.',--/- g. 0 C,-re- 6 -
Address: Phone:
Phone: -a,'- -3--5f..)
Builder: Engineer: •r.. - 4I4 6- .,vim
/
Address: ' Phone: • _;, 36. 9�
Phone:
N/A YES NO
1.Required#of copies received ei
z.
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1 j
5.Water line 10 ft from septic components Var.: i//
6.Benchmark indicated and shown-NGVD if near wetlands ✓
7. Septic tank minimum 10 ft from foundation, deck Var.: -- r S6(-16 V
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9.Leaching minimum 100 ft from wetlands Var.: IV
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V
11.Tank/leaching minimum 10 ft from property line Var.: 1r
12. System meets all other setback requirements Var.: V'
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: ,/
15. System not in top or subsoil(A,B horizons)or 5'removal A
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 'A"preferred . V
18. System meets breakout requirements PVC liner: Wall: /
19. Specified tee sizes are proper, gas baffle on outlet tee V
20. Sewage is under 10,000 gpd for parcel
t 21.No garbage disposal V
22. System adequately sized for its intended use ,,
23.Minimum 6"stone or compacted below tank and dbox V
24.Manhole covers within 6"of grade,pump chamber cover to grade ,,
25.Inspection port on plastic chambers/leach field i
26.Electrical permit for pump chamber/Separate meter for duplexes /
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ✓s
28. Septic tank/pump chamber to be factory waterproofed ✓
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber 1//1
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 1
33.H-20 loading is subject to vehicular traffic, groundwater ✓/
34. Title V Application and permit fee, installer signature j
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37.Check area lots for groundwater/Label groundwater in Assessor's Map V
Plan reviewed by: c'hik, ►4t1g 6/03/03