SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. f g` Lot III Zone of Contribution: In Out A`r creage
Commercial: Residential: C------Street: 76 Ae4,1a kA
Village: Floor Plan: ✓ #Bedrooms: 11 '
Owner: 444 t 4l,� agev-g_ Installer: J 7'P i fic5;
Address:231,(424 /, Phone: IO
Phone: ,j
C SA/ � �
Builder: Engineer: ii(" 7
Address: Phone: a ti i . /if ,..,:...----.27�
Phone: p / 4. ' 4
i
N/A -, NO
1.Required# of copies received
2.Date of soils exam and percolation test not older than 2 years �
3.4-5 ft of naturally occurring pervious material,above water table `�..:---y`
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ....i'`
5.Water line 10 ft from septic components Var.: �r---
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: :.-/
_ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ....----
9.Leaching minimum 100 ft from wetlands Var.: i ----
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 1---- -
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: t_.----
13.Uses adjustment for maximum high groundwater Var.: C../
14.Leaching set 4-5 ft above adj.water or botto.' . ' est io `1', Var.: \---- --
15.
`„/15. System not in top or subsoil(A,B horizons or 5' remov. i--------
16.Proposed contours are suitable L------
17.
f-�17. System meets slope requirements-min. 1/8", '/4"preferred k.---
18.
18. System meets breakout requirements PVC linertj e, j Wall: k....-----
19. Specified tee sizes are proper, gas baffle on outlet tee ' t.------
20.
--�20. Sewage is under 10,000 gpd for parcel k.---
21.No garbage disposal c_..---'
22. System adequately sized for its intended use 4
_23.Minimum 6"stone or compacted below tank and dbox `/
24.Manhole covers within 6"of grade,pump chamber cover to grade L-.---
25.
/25.Inspection port on plastic chambers/leach field L----
26.Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ..____-_''
28. Septic tank/pump chamber to be factory waterproofed .------
29.Vent provided if leaching below 3 feet,under driveway/parking ✓''
30.Buoyancy calculations for tank/pump chamberi'---'
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓-----
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee,installer signature ------
35.
/35.Foundation footing min. 2 feet above adjusted ground water for new house '.......----
36.
--36.Deed Restriction required max. #bedrooms: max. flow: gpd 't.__.----'
37.Check area lots for groundwater/Label groundwater in Assessor's `._
r� -J
Plan reviewed by: l� 6/03/03