Loading...
HomeMy WebLinkAbout1990 May 02 - Letter from Weller & Assoc. WELLER & ASSOCIATES 714 MAIN STREET P.O. BOX 119 YARMOUTH PORT, MASSACHUSETTS 02675 • CONSULTING& DESIGN ENGINEERS CIVIL& STRUCIVRAL TEL.: (508) 362-8131 • REGISTERED PROFESSIONAL LAND SURVEYORS FAX.: (508) 362-6868 • PROFESSIONAL PIANN/NG&DESIGN • CONSTRUCTION/MANAGEMENT May 2, 1990 Bruce Murphy, Health Agent Town of Yarmouth Town Hall South Yarmouth, MA 02664 RE: Lot`3 Cocheset Path Dear Bruce: Please be advised that we will certify and provide an "As- Built" Plan for the sewage system and final gradings. The final grading to provide a negative grade from the foundation in all directions for a minimum of twenty feet. The first fifteen feet of the driveway to have a negative pitch back to the road, and the final berm to be continuous across the throat of the driveway. If you have any questions, please do not hesitate to contact us. Very truly yours, { William G. Weller RIECEOVIED WGW:ket MAY 2 1990 cc: file 4 HEALTH DEPT.