Loading...
HomeMy WebLinkAboutReview Checklist r '-ve-17 Pkoi:00t) e_._ ,05(-k--A.,e 049, G TOWN OF YARMOUTH _, SEWAGE PLAN REVIEW CHECKLIST wi; �4 -s c4e, -s s.P9 Location: A.M. 59 Lot 30 Zone of Contribution: In Out 2 Acreage r AtIcaeo? Commercial: Residential: Street: 1 4,,, c- /< '0( e Village: 6140 Kdr,0 C Floor Plan: d #Bedrooms: Owner: Elle" /7, n7e6ialG/"17 Installer: S caTT ✓v7 .c.,,,14 Address: Phone: Sob A95=o 9 p Phone: Builder: Engineer: h).9, €, C-sc, hc: 7 ow,- Address: ! Phone: ,See y....08��f . Phone: N/A YES , NO 1.Required#of copies received ✓ 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table ✓ 4.Foundation 2 ft above high point of road . H.P.: Fnd: Var.: V 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 4c e)h. 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: C 5')' Q 9.Leaching minimum 100 ft from wetlands Var.: ,/ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: $/ 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: t/ 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: ✓ 15. System not in top or subsoil(A,B horizons)or 5'removal ,✓ 16.Proposed contours are suitable L// 17. System meets slope requirements-min. 1/8", I/<"preferred ✓ 18. System meets breakout requirements PVC liner: Wall: ✓ / 19. Specified tee sizes are proper, gas baffle on outlet tee V 20. Sewage is under 10,000 gpd for parcel ✓ 21.No garbage disposal f 22. System adequately sized for its intended use V 23.Minimum 6"stone or compacted below tank and dbox 14. 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach fieldA// 26.Electrical permit for pump chamber/Separate meter for duplexes ✓ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size V 28.Septic tank/pump chamber to be factory waterproofed ✓ 29.Vent provided if leaching below 3 feet,under driveway/parking V. 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: ✓ 32.Engineer/Registered Sanitarian and Land Surveyor stamps/sigoature �i 1, GS 33.H-20 loading is subject to vehicular traffic, groundwater i/-10 D#SGX evo V 34.Title V Application and permit fee,installer signature 1/35.Foundation footing min.2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: +`016A 6/03/03