HomeMy WebLinkAboutDock Plan 1-20-20205'i
C/
EXISTIN DOCK REMAINS PER DEP
INTERIM PPROVAL LICENSE 6120 (1996)
EXISTING CK AND
STEPS TO REMOVED
�.,rt_.___._ 75' OFFSET
\ FROM
° //\, ADJACENT
NORTH FLOAT
C
/
MANAGE INVASIVES
\r AND EXISTING
\ 4'-6' VIEW
/ HIEGHT
soo
d EXISTING ®F 9yFFpOOFCk ///
s DWELLING rpR iN \
�T� TOF = 12.912z
T 66
\_
5001 SF �F �� v
, COQ \
-
OLSEN SUSAN (PERS REP) PRGARDEN R'4IN
C/O LOCKE SHERYL C
4238 ALABAMA AVE SOUTH
C ST LOUIS PARK, MN 55416
G' ASSESSORS MAP 110, PARCEL 34
CEXISTING FIRE PIT/
. ` PERVIOUS PATIO �T41
-yC
PAUL BUCKLEY
32 MAYFLOWER TERRACE,
SOUTH YARMOUTH, MA 02664
20" OAK ASSESSORS MAP 110, PARCEL 35
_ Jr EwS-5. uv,i L_.
DEED BK. 31074 PG.
Imo— 4' ►1
" RAILINGS (TYP)
RECESSED DECKING
W/ 3/4" SPACING .
SITE PLAN
10 5 0 1.0 70 40
1"=20'
2"x6" RAILING CAP
4"x4" POST BOLTED
/ THROUGH YOKES AND
JOISTS (TYP)
2"x12" STRINGERS
(6 TOTAL, TYP)
OR (3) 4'x10"
3/4" THROUGH—BOLTS
-- (TYP)
3"x10" YOKE; (2) TYP.
°
3"x8" CROSS
BRACING, (TYP)
THROUGH BOLT WITH
DOCK WASHERS (TYP)
8-10" GREENHEART PILE (INSTALL
BUTT END DOWN, TYP) OR
"PEARSON" FIBERGLASS PILES
INSTALL SCREW ANCHOR AT
EACH BENT BEYOND MHW TO
PREVENT ICE UPLIFT
SECTION B -B ELEVATION DETAIL
2 4
V=2'
DCE ##
I
2"x6" RAILING B
CAP (TYP)
°
2"x4" RAILING
5/8" THROUGH 2"x6" DECKING W/ 3/4"
BOLT TYP SPACING; OVERLAP 1" (TYP)
2"x12" STRINGERS
°
(TYP)
3"x10" YOKE; _ %4" THROUGH
(2) TYP. _ BOLT WITH DOCK
WASHERS (TYP)
�i3%8" CROSS
BRACING, (TYP)
8-10" GREENHEART
OR FIBERGLASS
PILES (TYP)
B
DOCK SECTION A—A ELEVATION DETAIL
1 .5 4 1 2 4
1"=2'
DOCK PLAN VIEW DETAIL
5 2.5 9 5 10 20
111=101
EXISTIN�DOCK REMAINS PER DEP
INTERIM PPROVAL LICENSE 6120 (1996)
PROPOSED 2'x8' STORAGE BENCH
rnvrvou, 14 MAMr W/UKAIINU
DOCK PLAN VIEW
215 Q 5 10 20
1 "=10'
I X,
0)NQ1
S�
75' OFFSET
FROM
AD NT
1 VVI"1V ,Ilt
LSCSF BEACH LAND UNDER OCEAN (SALT POND)
BVW
LAWN i PIER, RAMP AND FLOAT EXTEND 48'3 BEYOND MHW �I
x
TOP OF COASTAL BANK (DEP FIGURE #4) jI� PROPOSED 4'x20' PIER; DECK PROPOSED 12" DIAM. x 30'
07Q HEIGHT = 7:9'1 NAVD88 LONG GREENHEART PILES; TOP
ROPOSED 12' RAM I� /BOTTOM OF PROPOSED 3.5'x2O' RAMP OF PILE = 12' NAVD (2 TOTAL)
.N r.OASTAI tRNA,
10
x
—5
LEGEND
MHW
MEAN HIGH WATER
MLIN
MEAN LOW WATER
—2—
ELEVATION CONTOUR
STORAGE BENCH
PROPERTY LINE
M ■ ■ M
LIMIT OF WORK/ACCESS
= 9
SHELLFISH SURVEY GRID
0
SHELLFISH FOUND IN GRID
Pc
s
A
Backyard Villay
®36 Mayflower Terrace
a
s
3
O WajS�,M NDmnisgy _.,.
vt
Mid -Cape Hwy' -
o
Supplies '" y"a°'
immunKy Connections Sports And Sundries
SURVEY NOTES: KEY P
NO SCAA LE
RECORD OWNERI SHERYL S. LOCKE
36 MAYFLOWER TERRACE, SOUTH
YARMOUTH, MA 02664
ASSESSORS MAP 110, PARCEL 34
DEED BK. 31200 PG. 52
PLAN BK. 79, PG. 101i LOT 66
PROPERTY LIES WITHIN RESIDENTIAL ZONE R40.
PROPERTY LINES DEPICTED HEREON ARE BASED ON A FIELD
SURVEY BY DOWN CAPE ENGINEERING IN MARCH, 2019 AND
COMPILED FROM PLANS ON RECORD RECORDED IN THE
BARNSTABLE COUNTY REGISTRY OF DEEDS.
PARCEL APPEARS TO LIE WITHIN FLOOD ZONE AE (EL. 9'
NAVD 88) PER FIRM PANEL #583 OF 875, COMMUNITY MAP
NUMBER 25001CO583J EFFECTIVE DATE JULY 16, 2014 AS
SHOWN ON THE FEMA ON—LINE DATA BASE.
WETLAND RESOURCES SHOWN WERE FIELD IDENTIFIED BY BRAD HALL
DATUM FOR ALL ELEVATIONS = NAVD 88
MEAN HIGH WATER = 1.9' NAVD 88
MEAN LOW WATER = —0.3 NAVD 88
SOURCE; DIRECT MEASUREMENT WITH HOBO U20L
WATER LEVEL LOGGER BY SHOREFRONT CONSULTING
THE PROJECT IS NOT WITHIN AN NHESP BOUNDARY AND IS
THEREFORE NOT SUBJET TO MESA REVIEW
CONSTRUCTION NOTES:
1. ELEVATIONS REFER TO NAVD 88. CONTACT DOWN CAPE ENGINEERING FOR ADDITIONAL
ELEVATION INFORMATION AS NEEDED.
2. CONSTRUCTION ACCESS SHALL BE VIA THE ACCESS ROUTE SHOWN ON THE PLAN
AND DIRECTLY OVER THE APPLICANT'S PROPERTY. 1
3. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE
INSTALLATION OF THE PROPOSED WORK. EQUIPMENT AND MATERIALS HANDLING SHALL
BE IN ACCORDANCE WITH THE WORK PROTOCOL SUBMITTED WITH THE NOTICE OF
INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY THE YARMOUTH
CONSERVATION AUTHORITIES.
4. THE DOCK INSTALLATION SHALL BE ACCOMPLISHED FROM A WORKING BARGE AS
MUCH AS PRACTICAL. THE REMAINDER OF WORK SHALL BE ACCOMPLISHED BY HAND.
AT NO TIME SHALL THE WORKING BARGE COME IN CONTACT WITH THE MARSH.
5. A WORK LIMIT SHALL BE STAKED AND MAINTAINED TO INSURE MINIMAL ACTIVITY IN
THE THE EXISTING MARSH WITH MINIMAL ACTIVITY OCCURRING BEYOND THE WORK
LIMIT. MATERIALS AND EQUIPMENT SHALL BE STORED ON THE APPLICANT'S PROPERTY
DURING TIMES OF HIGH TIDE AND WHEN NOT IN USE. WORKING BARGE TO BE
ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE.
6. PILES SHALL BE DRIVEN BUTT END FIRST TO THE DEPTHS SPECIFIED ON THE PLAN.
IF DESIGN EMBEDMENT CAN NOT BE REACHED, SHOREFRONT CONSULTING SHALL BE
CONTACTED BEFORE PROCEEDING. PILES CAN BE INITIALLY JETTED TO SET, BUT THEN
SHALL BE MECHANICALLY DRIVEN FROM THE WORKING BARGE. EACH BENT BEYOND
MHW SHALL BE ANCHORED TO THE BOTTOM WITH A HELICAL OR MANTA STYLE
ANCHOR FOR PROTECTION OF ICE UPLIFT.
7. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR
PRE—CONSTRUCTION CONDITION. ALL WORK SHALL BE INSPECTED BY SHOREFRONT
CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE SITE.
8. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTOREDITO
RESEMBLE THE PRE—CONSTRUCTION CONTOURS AND CONDITIONS.
9. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR
THE PROJECT BY THE YARMOUTH CONSERVATION COMMISSION PRIOR TO THE START
OF ANY WORK.
10. ALL HARDWARE SHALL BE GALVANIZED OR STAINLESS STEEL, UNLESS OTHERWISE
APPROVED BY OWNER OR SHOREFRONT CONSULTING.
11. THE EXISTING DOCK SHALL BE REMOVED AND DISPOSED OF PROPERLY.
NO PART OF THIS DRAWING MAY BE USED BY ANY
PARTY WITHOUT THE EXPRESS WRITTEN CONSENT OF
SHOREFRONT CONSULTING AND
DOWN CAPE ENGINEERING, INC.
EX. DWELLING
IV)
PROPOSED 2'x8'
FOUNDATION
STORAGE BENCH
FEMA FLOOD EL.
= 9
2
1/20/20
Move float out 4 feet, lengthen dock and romp to match
MCB
1
PROP SED 10'
Add 2 rain gardens and fire pit to site plan, rebuild deck
MCB
EX. GRADE
DATE
RWSION
BY
SHEEr TfRE
PLAN SHOWING PROPOSED
PIER, RAMP, AND FLOAT
AX
_20' FLOAT
10/1/19
PROJECT
SHERYL LOCKE
36 MAYFLOWER TERRACE SOUTH YARMOUTH MA
DRAwN er
MCB
CHECKED BY DO
5' PUBLIC AC S
DOWN CAPE ENGINEERING
939 MAIN STREET
YARMOUTHPORT, MA 02675
(508) 362-4541
SHOREFRONT CONSULTING
290 CENTER STREET
DENNIS PORT, MA. 02639
(508) 280-8046
WWW.SHOREFRONTCONSULTING.COM
C_
or SHEM
k
—
TL
�MHW=
1.9rn
wMLW=
'0.3'
3' 3.8'
J
��� IVILYY
EX. GRADE
PUT ADDITIONAL FLOTATION
ON HIS END
PROPOSED 8"-10" DIAM. x 16'
LONG
GREENHEART PILES (2 TO
PROPOSED 8"-10"
DIAM. x 24'
LONG GREENHEART
PILES (2 TOTAL)
O
I
I
O+OO �ZNOFMgssq tNOFMASS
SECTION A—A ELEVATION DETAIL oo� DAAIEL cy�N �2�OJALA �cC 1+00
m ° DANIF_LA
m
5 2.5 Q 5 10 20 OJALA " CIVIL N
A
No, 40980 A No. 46502
9
1"=10' � °Fess° P -ao 51F
`Ss
Nn �-20-oto
W;
2
1/20/20
Move float out 4 feet, lengthen dock and romp to match
MCB
1
12/11/19
Add 2 rain gardens and fire pit to site plan, rebuild deck
MCB
NO.
DATE
RWSION
BY
SHEEr TfRE
PLAN SHOWING PROPOSED
PIER, RAMP, AND FLOAT
PROJECT N0.
SC -129
AS SHOWN
10/1/19
PROJECT
SHERYL LOCKE
36 MAYFLOWER TERRACE SOUTH YARMOUTH MA
DRAwN er
MCB
CHECKED BY DO
DRAWING N0.
LOCKE.DWG
DOWN CAPE ENGINEERING
939 MAIN STREET
YARMOUTHPORT, MA 02675
(508) 362-4541
SHOREFRONT CONSULTING
290 CENTER STREET
DENNIS PORT, MA. 02639
(508) 280-8046
WWW.SHOREFRONTCONSULTING.COM
C_
or SHEM
W;