SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Zef Lot_
Street: `77
Village: (/
Owner:TO�G z
Address:
Builder:
Address:
Phone:
Zone of Contribution: In Outll, Acreage
Commercial: Residential:_
Floor Plan: Ll--�
# Bedrooms: 7
Installer:
Phone:
Engineer:
Phone: ^ 77
N/A
YES NO
1. Required # of copies received
-�
2. Date of soils exam and percolation test not older than 2 years
c
3.4-5 ft of naturally occurring pervious material, above water table
�!
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown - NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:y
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: Z
tr
9. Leaching minimum 100 ft from wetlands Var.: '
c/
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 11 above ad'. water or botto f-tGS hole Var.:
15. System not in top or subsoil (A,B horizons) or 5' removal
16. Proposed contours are suitable
17. System meets slope requirements - min. 1/8", ''/4" preferred
-
18. System meets breakout requirements PVC liner: all:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal
22. System adequately sized for its intended use
��-
23. Minimum 6" stone or compacted below tank and dbox
24. Manhole covers within 6" of grade, pump chamber cover to grade
U'
25. Inspection port on plastic chambers/leach field
Z/
26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system -2" lineweep hole,check v lve-tee-in dbox pump size
28. Septic tank/pump chamber to be faqoate roofed
29. Vent provided if leaching below 3 feet, under &N-ewa / arkin
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. # bedrooms: --2.- max. flow: %7/U gpd
37. Check area lots forgroundwater/Label groundwater in Assessor's Ma
Plan reviewed by: ! &03103