Loading...
HomeMy WebLinkAboutMark Burgess response to DMF comments (2) Grant, Kelly From:Mark Burgess <shorefrontconsulting@gmail.com> Sent:Friday, February 14, 2020 12:50 PM To:Nuttall, Ryan (FWE); Grant, Kelly Cc:Caia, Conrad; barbara.h.newman@usace.army.mil; Boeri, Robert (ENV); ONeil, Terry (FWE ); Shields, Thomas (FWE ); Feeney, Eileen (FWE) Subject:Re: Clark-Zhang Family Trust, NOI, Yarmouth Attention! This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Hi Everyone: Just to quickly address some of the questions in the letter from Eileen. 1) TOY restriction; no problem 2) if the float is removed, it would not be dragged; either a professional company would "pick it" and place on a truck, or tow it to a boat ramp, etc. It wouldn't be dragged anywhere. At the most, PVC pipe could be used to "roll it" out of the water and place it on the lawn. That is more of a DIY option, which I don't see this applicant doing at all. 3) The dock is 3 feet wide, meeting the 1:1 ratio. I realize this is narrow and not the "standard" to which I usually design, so it's easy to miss. The details are also labeled as 3 feet wide. 4) Dredging is not proposed; that is a typo in the narrative; my apologies. 5) The beach sand will definately be a topic of discussion at the hearing. Thank you. Mark Burgess Shorefront Consulting "If You Want A Dock, We Have To Talk" "Engineers get to work when others say it can’t be done….." 290 Center Street, Dennis Port, MA 02639 Phone: 508-280-8046 Email: shorefrontconsulting@gmail.com Web: www.shorefrontconsulting.com Facebook: Shorefront Consulting I build my business on referrals. If you know anyone who can benefit from my services, please let me know. On 2/14/2020 9:12 AM, Nuttall, Ryan (FWE) wrote: Dear Commissioners, Attached is the Massachusetts Division of Marine Fisheries (DFM) comment letter addressing the submitted revised plans for the Clark-Zhang Family Trust project in the Town of Yarmouth. Thank you, Ryan Nuttall 1 Sent on behalf of Eileen Feeney 2