Loading...
HomeMy WebLinkAboutEngineered Plans - 2020NOTE, EXISTING SAS IN AREA OF PROPOSED SAS SEPTIC SYSTEM PROFILE Omit to scale) ThICK Flaherty Environmental Services P.O. Box 331 Hanvkl►, MA 02845 774.9W. 1166 IF REQUIRED IIM17?bMAtmtNl �. . 000a 0o0Elm c 0 00P • 000000 e 0000000°0° 0 0 0°00o0o°e o°o°o° 000°0°0 0°0°o0o°c o° o°o°o°o°o°o o°o°o°o°c�l' I o 0000°000 ®� 0°0°o°o°c 0 00000 00 0 0 0 0 0 0 0 0 00°0°000°0 0°0°00 a .' 00000000° i11,ZOGBGi1 0000000°0 °00000 , .. 0000°000c SIw SOIL ABSORPTION SYSTEM OMPACTED (2) 500 GALLON H-20 CHAMBERS 6.0' WITH 4' STONE AROUND IN A " to "DOUBLE WASHED STONE 12,83'X 25'X 2' CONFIGURATION BOTTOM OF TEST HOLE EL. 45.0' [4�-45& USGS ADJUSTMENT: N/A L0r.47WU1lP 10 GROUNDWATER ELEV: N/A S 56 0' J� DECK I ENC. PORCH � � ,4n ,/ 16.3 / EXISTING \ 5 2 BR / DWELLING INGRID MAHONEY 8 CIRCUIT ROAD EAST ' L 128 5,000 MAP 49 LOT 66 �0 \ LEGEND -9 -wj Y " 14 WATER LINE 41HE8116 ON& OVERNEAO UTIL. " EXIST. COlTU1RS — — — — — - PROP. CONTOIRS ,ct /_ EXIST. FENCE 54 5.0 BENCHMARK: TOP OF RVDN EL. 58.0' 56 I Permit valid fur RF,PAIR OF �I IPIC SYW"A ONLI due to S13te and Local .optic variances. ltoard of Health review and appj �.,.d is required for any future ad.titions/renova(oo- alterations to wwage facilitly and/or structures d—Iling. YarinulrHl llcalth mlim uuent /APPROVED dY/� A, _ J 21 RWIPaz peI" An LLITE'WaM V !j 1 Tq REmeB 40 SITE AND SEWAGE PLAN FOR e B Bt B EXCAVATION, INC./ INGRID MAHONEY 8 CIRCUIT ROAD EAST ' WEST YARMOUTH, MA P" 1 OF2 GENERAL NOTES 1. ALL PRECAST COMPONENTS TO BE H-10 RATED UNLESS OTHERWISE SPECIFIED. DISTRIBUTION BOX AND ANY COMPONENTS WITH ANY ANTICIPATED VEHICULAR TRAFFIC TO BE H-20 RATED. 2, THE DESIGN OF THIS SYSTEM DOES NOT ALLOW FOR THE USE OFA GARBAGE GRINDER. 3. MUNICIPAL WATER IS AVAILABLE. 4. ALL CONSTRUCTION TO CONFORM WITH 310 CMR 15.000 AND ALL OTHER APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS. 5. INSTALLER/CONTRACTOR TO REVIEW & VERIFYALL ELEVATIONS AND DETAILS AND REPORT ANY DISCREPANCIES TO DESIGNER PRIOR TO CONS77ZUC77ON OR ASSUME ALL RESPONSIBILITYY, 6. INSTALLER/ CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SAFE WORK AREA, VERIFYING ALL U77LMES AND N077FYING "DIG SAFE" (1-888-344-7233) 72 HOURS PRIOR TO CONSTRUCTION. 7. ANY CHANGES TO OR DEVIATIONS FROM THIS PLAN MUST BE APPROVED IN WRITING BY FLAHERTY ENVIRONMENTAL SERVICES AND LOCAL BOARD OF HEALTH. 8. FINISH COVER OVER COMPONENTS IS NOT TO EXCEED X PER 310 CMR 15.000 UNLESS SHOWN PER PLAN. 9. ALL ABANDONED SEP77C SYSTEM COMPONENTS TO BE PUMPED DRYAND FILLED WITH CLEAN SAND OR REMOVED AND REPLACED WITH CLEAN SAND. I0.ALL COMPONENTS TO BE PROVIDED WITH WATER77GHT ACCESS PORTS WITHIN 6" OF FINISH GRADE. II.ALL SEPTIC TANKS, DISTRIBUTION BOXES AND PIPING TO BE INSTALLED WATERTIGHT. I2.NO KNOWN WETLANDS OR WELLS WITHIN 150 FEET OF PROPOSED LEACHING,. 13. THIS IS NOTA CERTIFIED PLOT PLAN AND UNDER NO CIRCUMSTANCES 15 THIS PLAN TO BE USED FOR ZONING OR BUILDING PURPOSES. 14. LOT IS SHOWN AS ASSESSOR'S MAP 49 LOT 66. IS.LOCUS PROPERTY IS NOT LOCATED WITHIN ANA QUIFER PROTECTION DISTRICT (ZONE II). 16. NO OTHER SEPTIC COMPONENTS ON ADJOINING PROPER77ES WITHIN 20' OF PROPOSED SYSTEM. DESIGN CALCULATIONS SYSTEM DETAIL Flaherty Environmental Services P. 0. Box 331 Harwick MA 02645 NUMBER OFACTUAL BEDROOMS 2 (DESIGN FOR 3) 774.994.1166 GARBAGE DISP094L UNIT NO TOTAL ESTIMATED FLOW (110G4L18R/DAYX28R) 220 GALJDAY REQUIRED SEPTIC TANKCAPACITY 440 GAL. 25' SIZE OF SEPTIC TANK 1500 GAL. (PROPOSED) SOIL CLASSIFICATION 1 DESIGN PERCOLATON RATE <2 MINANCH EFFLUENT LOADING R47F 0.74 GALJDAY/FP O O 12,83' LEACHINGAREA ? (2)x(25.0'+12837(r) =r518F _ - 25.0'x 12.83' = 320 SF 471 SF 0.74 = 348 GPD USE (2) 500 GALLON H-20 CHAMBERS WI774 4' STONE INA 12.83'X25'CONRGUR4TIONASDIAGRAMMED RESERVE LEACHING CAPACITY N/A SOIL EVALUATION TESTHOLE#1 EvAtialor. David D, FWw1yJr., RS REHS SE#2755 BOHWftft MaffiXyLWVW RS Date., FetwwY5,2020 TH-1 ELEV. 56.0' 0'-9' IA LS MR= e•-28' I B LS 10YRff 28'-132" I C MS 2.5Y" G.W. ELEV. WA BOTTOM TH•1 ELEV. 45.0' O (NTS) l aw* dW on Novwrdw 12 2002,1Aavwpmsed "Ow"AfkMAMsAwmedbybreD4w Wot EM*vM e W Pmmcwn and Oreo Ore above &w&sb Ams ben mftm ed by me =WsAW wOOre mqubed ftz*ft, &Wwdee, and aww*xw desowed In 310 CMR 15.018(2).' SITE AND SEWAGE PLAN FOR B 8c B EXCAVATION, INC./ INGRID MAHONEY 8 CIRCUIT ROAD EAST WEST YARMOUTH, MA PAGE20F2 DAM217&M