Loading...
HomeMy WebLinkAboutBld-18-006757 & Bld-18-004698 Sears, Tim From: Sears, Tim Sent: Friday,June 28, 2019 9:32 AM To: 'Jigar Patel' Cc: mikenadzeika@outlook.com; Grylls, Mark; Huck, Kevin Subject: RE: Hilti fire stopping cape point Tracking: Recipient Read 'Jigar Patel' mikenadzeika@outlook.com Grylls,Mark Read:6/28/2019 9:32 AM Huck,Kevin Read:6/28/2019 9:40 AM Mike, Here is a list of corrections from yesterday's inspection; • Firestopping in attic above rooms, 201, 202, 203, 204,207, 208,211, 235, 252, 254, 258, is either not complete or done incorrectly • Room 234 light fixture hanging, and hole in ceiling • Second floor mechanical room firestopping not done,and remove top storage shelves • First floor sprinkler room has hole in ceiling and missing electrical box cover • First floor ice machine alcove needs ceiling, and exit sign is too close to sprinkler head in hallway • Rooms 102, 137 need door closers • Room 124 carpet lifted • Rooms 111, 113, 115, 122 sprinkler head covered with plaster • Basement electrical room has holes in ceiling,firestopping not done correctly,sprinkler head under stairs needs to be moved out, and label for exterior door • Mikes office needs sprinkler head trim • Storage in kitchen &cafe areas needs to be min 18" from ceiling • Lobby bathroom sprinkler head missing trim • Panic hardware for doors in assembly area on second floor&closer needed for storage closet, paint on sprinkler head • Light covers in offices at main entrance • Mechanical room second floor over lobby needs door for attic access, sprinkler head trim, and firestopping • Pool area has sprinkler trim missing in front window& hole in ceiling • Main basement holes in ceiling in sprinkler&elevator room, dryer vents need to be replaced,firestopping needs to be done correctly • Exterior front of building fan exhaust missing cover, back of building has hole around gas pipe • Street number for building needed • Final affidavit from architect The following items need to be addressed by the architect in writing; 1. Correct firestopping systems are being used in the above areas mentioned? 2. Door needed at service area entrance hallway? 3. Railings for café entrance steps needed? 1 4. Insulation for all attic access doors? The items listed above all need to be repaired and re-inspected before a temp CO will be issued. Timothy Sears CBO Building Inspector Town of Yarmouth 508-398-2231 Ext. 1259 mailto:tsears@yarmouth.ma.us From:Jigar Patel [mailto:jpatel29@gmail.com] Sent: Friday,June 28, 2019 7:01 AM To:Sears,Tim <tsears@yarmouth.ma.us> Cc: mikenadzeika@outlook.com Subject: Hilti fire stopping cape point Attention!T.hiemail5o . s outside of ,or tion. Do not pe ft chm are sur-e.his ai; s from a ,own nder d you� o� a contents, fe Ca the finer too eri nsi .. Otherwise.delete thi erg l On site getting this fixed in the morning ASAP. Please let's get temp CO today please!! We are all about life safety as well and I promise I will get all this done. I need to open doors today I'm in pain. Jigar Patel S&H Development 3 Allied Drive Suite 303 Dedham MA 02026 516-993-5601 2