Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH rSEWAGE PLAN REVIEW CHECKLIST Location: A.M. 12.4 Lot 55- Zone of Contribution: In Out X Acreage . r 2- Commercial: Commercial: Residential: If( Street: . 2 old Chwrai St: Village: Arilm.41 pDr - Floor Plan: #Bedrooms: 9- Owner: W it l iawl boli (k Installer: (4rx D i i I ne Address: Phone: U Phone: Builder: Engineer: 60 6/h (p+C End Address: Phone: Phone: N/A YE NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: X 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown=NGVD if near wetlands t 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: v•-'" 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11.Tank/leaching minimum 10 ft from property line Var.: ,/ 12. System meets all other setback requirements Var.: ✓ 13.Uses adjustment for maximum high groundwater Var.: �✓ 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: V _ r 15. System not in top or subsoil(A,B horizons)or 5'removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '/a"preferred . ;/- 18. 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee V- 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use ✓ 23.Minimum 6"stone or compacted below tank and dbox ✓ 24.Manhole covers within 6"of grade,pump chamber cover to grade ✓ 25.Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size V 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking ✓ 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: t - 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater t/- 34. /34.Title V Application and permit fee, installer signature ✓ 35.Foundation footing min.2 feet above adjusted ground water for new house ✓ z. 36.Deed Restriction required max. #bedrooms: max. flow: gpd V 37.Check area lots for groundwater/Label groundwater in Assessor's Map viol.Plan reviewed by: 6/03/03