Loading...
HomeMy WebLinkAboutEngineer Certification Letter BSC GROUP Tranapormoon•Energy•land Development 349 Main Street (Route z8),Unit D West Yarmouth MA 02673 March 31,2020 Tel: 508-778-8919 800-288-8123 Bruce G.Murphy,Health Director Town of Yarmouth www.bscgroup.cmlt 1146 Route 28 South Yarmouth,MA 02664 RE: Certification of Sewage Disposal System 34 Vacation Lane,West Yarmouth,MA BSC Project No.50250.01 Dear Mr.Murphy: On March 24,2020 BSC visited the above referenced property to observe the bottom of the soil absorption system,removal of unsuitable materials and the completed installation of the proposed septic system improvements. Based on our observations,we are pleased to report that the newly installed septic system,as constructed,is in substantial compliance with the approved plans and regulations,as set forth in 310 CMR 15.000 and the Town of Yarmouth Board of Health Regulations. Please do not hesitate to contact me if you have further questions or concerns. Very truly yours, BSC GROUP,INC. (4-0 OF lfl c\\\ OWAN G. Y@RGAT1AN , f iQ_ Rtr9,4:1,7,, -nears 41110 Environmental Sdenttns Brian G. Yergatian,P.E.,LEED AP Custom Software Project Manager&Senior Associate Developers Landscape Architects Planners Surveyors TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 3 9 Lot 61 1-- Zone of Contribution: In Out Acreage Commercial: Residential: ;� Street: . _%f \, t::,--c- -r / Village:,,,,t,.., 7,- yc,%-,,; - Floor Plan: V #Bedrooms: Owner: r)ap /c1-y , /c9@,L Installer: ( / Address: i-y/ _� jam,, , Phone: Phone: Builder: Engineer: 73 SC--. - Address: /'' Phone: • S, -778- 0`','l g Phone: N/A YES,/, NO 1.Required#of copies received V 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: ,/ 6.Benchmark indicated and shown=NGVD if near wetlands 7.Septic tank minimum 10 ft from foundation, deck Var.: l X,S k- /v-> 1 / 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ,/ 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V 11.Tank/leaching minimum 10 ft from property line Var.: / 12.System meets all other setback requirements Var.: / V 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: J 15. System not in top or subsoil(A,B horizons)or 5'removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/a"preferred . V 18.System meets breakout requirements PVC liner: Wall: 17, 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel t.,7, 21.No garbage disposal �V 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox V 24.Manhole covers within 6"of grade,pump chamber cover to grade 4/ 25.Inspection port on plastic chambers/leach field / 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve, in dbox,pump size // 28. Septic tank/pump chamber to be factory waterproofed ,/ 29. Vent provided if leaching below 3 feet,under driveway/parking ,/ 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: . 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater J 34.Title V Application and permit fee, installer signature C) 35.Foundation footing min.2 feet above adjusted ground water for new house i 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: p, 10 (l (7, 6/03103