Loading...
HomeMy WebLinkAboutReview Checklist litiTOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. (� Lot `2--" Zone of Contribution: In Out vlcoreage Commercial: Residential: C----"'"' Street: 4/ 4,60(17 /42.4?" Village: V Floor Plan:_{:____ #Bedrooms: Owner: _sitter 24 mei Installer: "7 Address: Phone: Phone: Builder: Engineer: Address: Phone: - 7?S-...-9,>_ Phone: Z . 4p r / N/ANO i 1.Required#of copies received ?S-7,-j 2.Date of soils exam and percolation test not older than 2 years C,,,_i I 3.4-5 ft of naturally occurring pervious material, above water table L----- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: t...,,./ 5.Water line 10 ft from septic components Var.: t y--- 6.Benchmark indicated and shown-NGVD if near wetlands `.. 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: -e--,- ), _ 9.Leaching minimum 100 ft from wetlands Var.: L.,________-- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 1.--- 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom est ho N.Var.: • 15. System not in top or subsoil(A,B horizons) 5' removalt../..- - 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred 1/4.------- 18. System meets breakout requirements PVC liner: Wall: 1.------- 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel i�,,/ 21.No garbage disposal j 22. System adequately sized for its intended use ✓- ` 23.Minimum 6"stone or compacted below tank and dbox t.. 24.Manhole covers within 6"of grade,pump chamber cover to grade L 25.Inspection port on plastic chambers/leach field 1/4.- ' 26.Electrical permit for pump chamber/Separate meter for duplexes _...--- 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size ,�- " 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet, under driveway/parking ----- 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓" 33.H-20 loading is subject to vehicular traffic, groundwater --�" 34. Title V Application and permit fee, installer signature L._ 35.Foundation footing min. 2 feet above adjusted ground water for new house --- 36. Deed Restriction required max. #bedrooms: max. flow: gpd ,,.i-- 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: ,'YhN) 6/03/03