Loading...
HomeMy WebLinkAboutReview Checklist , . R.--79 �, TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. /57 Lot 5 Zone of Contribution: In Out e Street: 4frf/(4), Commercial: Residential: Village: Floor Plan: #Bedrooms: I ,,gyp Owner: 5%'��7 0 ////ok/ fi 7;16 taller: 7 Phone: Address: / ' Phone: cze-- 6/1-c--6/1-c-- e 7 /X ,,,,,Q -- Builder: l ��'(�7 Engineer: � fi Address: Phone: -1(2:- ¢� Phone: ' heft '4 /6�" 2ed-�/ N/A , YES NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years _ 3.4-5 ft of naturally occurring pervious material, above water table �...--- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1/4---- 5. Water line 10 ft from septic components Var.: %.----- 6.Benchmark indicated and shown-NGVD if near wetlands C-- 7. Septic tank minimum 10 ft from foundation, deck Var.: (..----- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: e-- 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: �> 12. System meets all other setback requirements Var.: ..._. ` 13.Uses adjustment for maximum high groundwater Var.: (--/ 14.Leaching set 4-5 ft above adj.water or bottom of thole ar.: (.l 15. System not in top or subsoil(A,B horizons)or 5 remova ,.--/ 16.Proposed contours are suitable t....----- 17. System meets slope requirements-min. 1/8", 'A"preferredC------'18. System meets breakout requirements PVC liner:.1 all: (.....----- 19. Specified tee sizes are proper,gas baffle on outlet tee t..---- 20. 120. Sewage is under 10,000 gpd for parcel L---- 21.No garbage disposal L.----- 22. System adequately sized for its intended use L-----' 23.Minimum 6"stone or compacted below tank and dbox L,,i 24.Manhole covers within 6"of grade,pump chamber cover to grade �----• 25. Inspection port on plastic chambers/leach field t.----"" 26.Electrical permit for pump chamber/Separate meter for duplexes c. 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking �' 30.Buoyancy calculations for tank/pump chamber ------' 31.Engineer to inspect and certify soils: wall: commercial: _ 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature `----- 33.H-20 loading is subject to vehicular traffic, groundwater ,_..----�� 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house ..----- 36.Deed Restriction required max. #bedrooms: max. flow: gpd _.------- 37. 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03