HomeMy WebLinkAboutTrench Permit •
*ovYkittr, TOWN OF YARMOUTH Building Department BUILDING
(508) 398-2231 ext.1261
14*oi ?
C PERMIT NO BLDTR-20-005387 PERMIT
+zo;,,,ams ISSUE DATE 04/13/2020 JOB WEATHER CARD
:.................. .............................. _..,..................,.
APPLICANT Richard Capen PERMIT TO
I AT(LOCATION) 1 COTTONWOOD ST,YARMOUTH PORT,MA 02 ZONING DISTRICT Bldg.Type:
I
SUBDIVISION MAP BLOCK LOT 105.46 BUILDING IS TO BE: CONST TYPE I USE GROUP
REMARKS Trench-septic installation rear of house CONTRACTOR
LICENSE BOHDI-14-0216
Septic System Installer
ROBERT B.OUR CO. INC.
P.O.BOX 1539
AREA(SQ FT) 872,855,280. EST COST($) PERMIT FEE($) 50.00 HARWICH, MA 02643
OWNER FLEISCHER ROBERT E {
BUILDING DEPT BY !
ADDRESS FLEISCHER AGNES T, 1 COTTONWOOD ST
YARMOUTH PORT MA 02675-2324 PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY
j OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPANCY 4)REFER TO DETAILED INSPECTION OCCUPIED UNTIL FINAL INSPECTION HAS
SCHEDULE BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
I
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.