HomeMy WebLinkAboutTrench Permit .Y44. TOWN OF YARMOUTH Building Department BUILDING
'Pt° (508)398-2231 ext.1261
PERMIT
F .,� \ 44 PERMIT NO :BLDTR-20-005361
ISSUE DATE 04/13/2020 JOB WEATHER CARD
APPLICANT Richard Capen PERMIT TO
IAT(LOCATION) 136 ASTOR WAY,SOUTH YARMOUTH,MA 0266 ZONING DISTRICT J Bldg.Type:
SUBDIVISION MAP BLOCK LOT 099.45 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS Trench-septic installation rear CONTRACTOR
LICENSE BOHDI-14-0216
Septic System Installer
ROBERT B.OUR CO.INC.
P.O.BOX 1539
AREA(SQ FT) 721,048,680. EST COST($) PERMIT FEE($) 50.00 HARWICH,MA 02643
OWNER CONNOLLY JOSEPH V
BUILDING DEPT BY
ADDRESS , 136 ASTOR WAY
SOUTH YARMOUTH MA 02664-1988 PHONE
I
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
I APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPANCY 4)REFER TO DETAILED INSPECTION OCCBEEN MADE.D UNTIL FINAL INSPECTION HAS
SCHEDULE
BEEN
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.