Loading...
HomeMy WebLinkAboutEngineered Plan - 2020LOCUS KEY: EXISTING CONTOUR: - - - - green se, PROPOSED CONTOUR: •"•"'•'•"• 3nn EXISTING SPOT ELEVATION: 25.5 4 N PROPOSED SPOT ELEVATION: 25.5 TEST HOLE: * Z 0 UTILITY POLE: -( p FENCE LINE: -< HYDRANT: �- Z � m RETAINING WALL: r t 0 0 �G O a� O � LOCATION MAP LOT 88 (20,066 SF) ASSESSORS MAP: 105 PARCEL: 46 PLAN BOOK: 207, PAGE: 55 M20-14 BENCHMARK AT PAINT MARK AT RIGHT CORNER OF DRIVE ELEVATION = 103,22 •�-- HYD. , IP_ ' M 25.0' LEACH AREA DETAIL SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 3 BEDROOMS AT 110 GAL / DAY = 330 GAL / DAY SEPTIC TANK: 330 GAL / DAY x 2 DAYS = 660 GAL USE 1000 GALLON SEPTIC TANK (EXISTING) LEACHING AREA: USE 2 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH _4' OF STONE ALL AROUND 25'x 12.8'x 2' EFF. DEPTH) SIDE AREA: (25'+ 12.81 x 2 x 2 = 151 SF (0.74) = 112 GAUDAY BOTTOM AREA: 25'x 12.8'= 320 SF -(0.74) = 237 GAL/DAY CAPACITY = 349 GAUDAY SEPTIC SYSTEM SECTION FIRST FLOOR COVERS WITHIN 6" 103.60 OF FINISHED GRADE TOP OF, FOUNDATION '` - .,, ,, FINISHED GRAD T MAX. 1/4 " per ft COVER 100.5 (1' MIN) ELEV. a 99.4 1/4"per ft (EXISTING) ELEV. 99.2 99.03 9.65 ELEV. ELEV. ELEV. -0516" OF STONEUNDER OR 1000 GAL MECHANICALLY COMPACTED) SEPTIC TANK TEE SIZES: (TO BE CONFIRMED) ELEV. INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN GAS BAFFLE AT OUTLET TEE 101.0 green se, DECK ROOM 3nn KITCHEN 101 BATH a CD Z 0 0 C to 3 0 Q CD moo" •• 10YR 5/8 � m � � m m 1 2.5Y 7/6PE,,_ RC AT 50" oyw`` `4 IP SEPTIC SYSTEM SECTION FIRST FLOOR COVERS WITHIN 6" 103.60 OF FINISHED GRADE TOP OF, FOUNDATION '` - .,, ,, FINISHED GRAD T MAX. 1/4 " per ft COVER 100.5 (1' MIN) ELEV. a 99.4 1/4"per ft (EXISTING) ELEV. 99.2 99.03 9.65 ELEV. ELEV. ELEV. -0516" OF STONEUNDER OR 1000 GAL MECHANICALLY COMPACTED) SEPTIC TANK TEE SIZES: (TO BE CONFIRMED) ELEV. INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN GAS BAFFLE AT OUTLET TEE LIVING I BED bt ROOM RM, EXISTING FLOOR PLAN Permit valid for REPAIR OF SEPTIC SYSTEM - ONLY, due to State and Local septic variances. Doard of Health review and approval is required for any future additions/renovations/alterations to sewage facilities and/or structures/dwelling. Yarmouth Health Department !APPROVED Date ,f�NCFM4s T�f vP� r':�o' "Io ANN WARNER E-, No. 58721 W C7 TEST HOLE LOGS ENGINEER: THOMAS MCLELLAN, P.E. WITNESS: MALLORY LANGLER, R.S� DATE: 4-2-20 PERCOLATION RATE: < 2 MIN/IN 2" PEASTONE OR FILTER FABRIC - 3/4" - 1 1/2" DOUBLE WASHED STONE INSPECTION PORT /- ELEV.= 98.83 A1.1 _°° ^°°°^°I -IM 96.0 4 ELEV. 4 25'x 12.8' 2 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND (25'x 12.8'x TEFF DEPTH) TH-1 101.0 green se, DECK ROOM 3nn KITCHEN BATH LIVING I BED bt ROOM RM, EXISTING FLOOR PLAN Permit valid for REPAIR OF SEPTIC SYSTEM - ONLY, due to State and Local septic variances. Doard of Health review and approval is required for any future additions/renovations/alterations to sewage facilities and/or structures/dwelling. Yarmouth Health Department !APPROVED Date ,f�NCFM4s T�f vP� r':�o' "Io ANN WARNER E-, No. 58721 W C7 TEST HOLE LOGS ENGINEER: THOMAS MCLELLAN, P.E. WITNESS: MALLORY LANGLER, R.S� DATE: 4-2-20 PERCOLATION RATE: < 2 MIN/IN 2" PEASTONE OR FILTER FABRIC - 3/4" - 1 1/2" DOUBLE WASHED STONE INSPECTION PORT /- ELEV.= 98.83 A1.1 _°° ^°°°^°I -IM 96.0 4 ELEV. 4 25'x 12.8' 2 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND (25'x 12.8'x TEFF DEPTH) TH-1 101.0 0/A HORIZON ELEV, LOAMY SAND 10YR 3/3 100.1 B HORIZON LOAMYSAND 10YR 5/8 912 C HORIZON MEDIUM SAND 2.5Y 7/6PE,,_ RC AT 50" 132"1 1 90.0 NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. i 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 66 FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. Zt/7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA, 12. THIS PLAN ECT TO CHANGE UNTILRES THE IEW S CHNTIME PTHIIS PLAN OVAL OF ONE OR MORE HAS BEEN PREPARED ED FOR WN THE ENTS AND SO E PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. EXISTING LEACH PIT IS TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. D APR 16 2020 or THOMAS J��r Mc1LELL AN a CIVIL No. 36471 N.11 IST t'�.c\�,@' II \jp v- t v v v v v THOMAS J. McLE , AN, P.E. EPT SITE PLAN ii LOCATION: 1 COTTONWOOD ST., YARMOUTHPORT, MA PREPARED FOR: ROBERT FLEISCHER DATE: 4-3-20 SCALE: 1" - 30'/ BASS RIVER ENGINEERING P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048