Loading...
HomeMy WebLinkAboutBld-20-000709 FEMA Flood Zone RECEIVED ! TOWN= ' AR OUTH 1146 Route 28 S.P 1 i � �` th, MA 02�6� 508Q (gyp (�Q (�Q Q _�. �.-.__-. _. ._. —398-223t \~ �' 08-398-08 6,t _DING DEPART'ENT Office of theM � s `,, missioner £4 1 Al S • FINAL COST AFFIDVIT FOR WORK IN FEMA FLOOD ZONE To the Building Commissioner, In accordance with 780 CMR Section 109 of the Massachusetts State Building Code, the total estimated cost of construction, including all related costs* of the building at 114 - 1(0 _ 1 and constructed,reconstructed, altered,repaired, or extended under building permit no. ({.-) -Q1O - amounts to $ I, b-Pl ikk s k-e4 LA ,being referred to as the owner/agent identified below,do solemnly swear that the statements made herein are strictly true, correct and made in good faith *Related construction costs include all work done with or concurrently with the work contemplated by the building permit including construction, reconstruction, repairs, demolition, HVAC work, etc. Furnishings and portable equipment are not part of the total construction costs. ignature of owner agent BEAR KROSEL. ' 1 Nct ry Publ c °\ i i.:C,T,r— to Of C'1,lSSl?S 1 4 `` My Camrrrssieri moires Aprii 16.2021 Notary Publ Signature My Commission Expires Notary Seal: