HomeMy WebLinkAboutBldsm-20-004316 •
Commonwealth of Massachusetts
Sheet Metal Permit
Date: / i //�j
Permit#: Btd5/1/ (13l,6
Estimated job cost:/ •; 4
C Permit fee:
Plans submitted:Yes Nq Plans reviewed: Yes No
Business license: 922 6 Applicant License: `J 77 6
Business info ution
goo '/®: minformation
Name: /c7s c,
Name: n30.- S
Street: 12 G I Street: 'l ��Ae" 1) S ;a
City/town: 1 C 7
.� G•-7irJ, • City/to �r l=� ���✓L �1�ir-.
Telephoner 6 • ;3 c Telephone: \\ &3i\joi-+ek..94\fOr •(
•
Photo ID attached?(required): Yes ✓ No IN
VAVN
J-1/M-1 unrestricted license
J 2/M-2 restricted to 3 stories or fewer and commercial up to 10,000 sq. ft./2 stories or fewer
tJ
Residential: 1-2 family ✓ Multifamily
amily Condo/townhouse Other
Commercial; Office Retail_ Industrial Educational Institutional Other
•
Square footage:Under 10,000 sq.ft. ;/Over 10,000 sq. ft._ Number of stories •
Work to be completed:New work ..�/Renovation . HVAC ✓ Metal watershed roofing—
Kitchen exhaust system_ Metal chimney/vents— Air balancing_
Detailed description of work,including g information from ACCA manuals S,J,and D. (If
this information is excessively long,it can be emailed to
L,�`• /74 /77 - <,, P/1 /F /cri, r Y,,� 0 <
l
1 ,
�� /11C731D S
•
•
- INSURANCE 90VERAOE:
I have a current)lability,Insurance policy or its equivalent which meets the requi ernent.of M.O.L.Ch.112 Yes 0 No❑ .
If you have checked In,indicate the of coverage by cheddng the appropriate box below .
•
A liability.Insurance policy Other type of indemnity 0 Bond ❑
OWNER'S INSURANCE WAIVER:I am aware that the license does not have the Insurance coverage required by Chapter 112 of the '
Maseach oral Laws,and that my signature on this permit application Blip this requirement.
_ , Check One Only .
L® . . ❑ Agent j]
:7-----:—.
signature of Owner or Owne•A ' . _ •
By checking the boxD,I h"etstlfyl thatthitallefiltriadle imdhifortnation I have enbmit d(or entered) •; "'` .,-t ,41 ,• Ito trn.and
accurate to the best of my knowledge and+tat sU,gheet metal work and Installation's performed under the penult ieeuod forthb application Will be
In oomptirmce with all pertinent provision of the Maaaghusetts Bonding Code and Chapter 112 of the General Laws. .
Duct inspection required prior to Insulation installation:YES NO
Inspections •
• • ' •
•
.,.,r,,...-+r.:— . • -, A,f..;: = ,-•^,�..y-+y�-.._ ,--,a4,,,._ ? -a'ayy-.... -t :� ' ',nu-,c-�.�b _ ,-,.,, -:=Eat:*+z'r�=..,`-'
.;.i, ligi•.ti.
•
Fhtal Iuavecdon
,
�° ❑Master-Restricted "LS-----,
•
alOUmeyperson
Pm** Signature of Licensee
•
Fee= u n-Re L e Number: '/ 76•
Check atwww.mass.uovidig •
�� /-6s. 'Id --- . '
km/peeler ggliature of Ps Approvsf • • .
•
•
....:... . .. ,3
.
tizenAccess/Default.aspx
ie,ericmeadsinc... ; I ASSESSORS DATAB,,, AHRI Certification.., YY FUJITSU el Bryant Registration Q Sid Harvey �11 Johnstone Supply -7 Homans Associates 0 F.W.Webb
please contact the issuing Agency directly using the links below.
Contact Ali iiholic Beverages Control Commission
Contact i)r^patr Starzti.arris
Contact tiiveoo n of r-ofiess,n l Licensure
Translation information-Click Here
To apply for an Energy and Environmental Affairs(DEP.MDAR or DCR)permit or
license,please click here.
Convenience Fee;For DPL and DLS transactions,please note that all on line credit
card transactions incur a 2.35%convenience fee.There is a of$0.35 associated
with online payment by ACH/EFT.
For ABCC transactions,please note that all on line credit card transactions incur a
2.35%convenience fee
Home Manage Licenses,Permits and Certificates File and Track Complaints
File an Online Application Manage My Licenses,Permits it Certificates
Record 4776-SM-Ml: Acid to collection
Sheet Metal Master License
Record Status:Current
Expiration Date:01/28/2022
Record info o Payments' Education . Custom Component
Premise Address
Record Details
Licensed Professional:
ERIC V MEADS
MI
52 Great Oak Rd
Brewster,MA,02631-1732
United States
Sheet Metal Master 4776
More Details
Create Anwtnt
•
��I
t ta10S ..c cif co
v s
,.1F rt
-4®r� S V#
IL t , 0 v N o
a � t {� t1 N .�.
o _
'� L o
_ a
eir- rn. Y •` x
cl 3;
Zz
+a,® _ U m
z
w
v:
Betterwood Homes-harbor Rd
HVAC Load Calculations
for
ElhEASdi
R H''A HVIAC L
Prepared By:
Evm
Meads Mechanical
PO Box 1207
Brewster Ma.02631
508-896-8950
Wednesday, February 5,2020
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D.
.47 ... �.._> wsa .z'' ,...�� ,F-�.�..,. �_ .,.. �_ar>is -1_+i, 'A� z 2
Project Report
General Project Information
Project Title: Betterwood Homes-harbor Rd
Designed By: Evm
Project Date: 2-1-2017
Company Name: Meads Mechanical
Company Representative: Evm
Company Address: PO Box 1207
Company City: Brewster Ma. 02631
Company Phone: 508-896-8950
Company Comment:
Design Data
Reference City: East Falmouth, Massachusetts
Building Orientation: Front door faces North
Daily Temperature Range: Low
Latitude: 42 Degrees
Elevation: 131 ft.
Altitude Factor: 0.995
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb ReLHum Re.I.Eurn Dry Bulb Difference
Winter: 10 12.83 n/a n/a 70 n/a
Summer: 88 72 47% 50% 72 34
Check Wires
Total Building Supply CFM: 2,126 CFM Per Square ft.: 0.736
Square ft. of Room Area: 2,890 Square ft. Per Ton: 599
Volume(ft3)of Cond. Space: 22,928
Building Loads
Total Heating Required Including Ventilation Air: 53,027 Btuh 53.027 MBH
Total Sensible Gain: 46,543 Btuh 80 %
Total Latent Gain: 11,369 Btuh 20
Total Cooling Required Including Ventilation Air: 57,911 Btuh 4.83 Tons(Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
s " s
a a ,, e'er „ !! a � r a s
Load Preview Report
Sys ,uct
Scope Cig Act
Ton /Tor Area Gain Gain Gai Loss S FM Size
CFM CFM CFM
Building 4.83 599 2,890 46,543 11,369 57,911 53,027 692 2,126 2,126
System 1 1.87 630 1,177 17,303 5,107 22,409 23,852 311 790 790 10x1;
Duct Latent 416 416
Zone 1 -Clq.:37%.Htq.:48% 617 7,176 1,794 8,970 11,474 150 328 328 7x1C
1-Living Room 240 4,602 776 5,378 5,241 68 210 210 2--6
2-Bath 1 84 405 145 550 885 12 19 19 1--3
3-Bath 2 100 1,247 485 1,732 2,857 37 57 57 1-4
4-Laundry 50 180 121 301 690 9 8 8 1--2
8-Entry 143 742 267 1,009 1,801 23 34 34 1--3
Zone 2-Ciq.:63%.Htq.:52% 560 12,173 2,897 15,070 12,378 162 558 556 9x1
5-Bedroom 2 273 5,839 1,224 7,063 5,889 77 287 267 3--6
6-Bedroom3 143 3,854 982 4,836 4,097 53 178 176 2--5
7-Bedroom 4 144 2,480 691 3,171 2,393 31 113 113 2-4
System 2 2.01 567 1,140 20,999 3,143 24,142 18,044 235 089 959 11x16
Zone 1 -Cia.:72%.Hta.:69% 776 17,109 1,893 19,002 12,486 163 781 781 10x1°
9-Kittchen Dining 540 9,549 1,146 10,695 9,080 118 438 436 4-6
10-Greaty Room 168 6,496 608 7,104 2,443 32 297 297 3-6
11-Hall 32 892 139 1,031 963 13 41 41 1-4
12-Half Bath 36 171 0 171 0 0 8 8 1--2
Zone 2-Clq.:28%,Htq.:31% 364 6,712 1,250 7,962 5,558 73 307 307 7x9
13-Master Bedroom 204 4,335 903 5,238 3,605 47 198 198 2-6
14-Master Bath 100 2,035 347 2,382 1,953 25 93 93 1--6
15-Closet 60 342 0 342 0 0 18 16 1--2
System 3 0.95 605 573 8,241 3,119 11,36C 11,131 145 378 376 8x10
Zone 1 573 8,241 3,119 11,360 11,131 145 376 376 8x1C
16-Bedroom 5 192 4,395 1,725 6,120 6,147 80 201 201 2--6
17-Bath 1 81 726 426 1,152 1,765 23 33 33 1--3
18-Bedroom 6 132 2,554 968 3,522 2,833 37 117 117 2-4
19-Closet 96 340 0 340 261 3 18 16 1-2
20-Hall 72 227 0 227 125 2 10 10 1-2
Sum of room airflows may be greater than system airflow because
system has multiple zones.
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
•
Iv.:11,,,,..,,, ,,l;:,,,:t_i,".14,t,...,
..,, ,
-:•,-:,,.,.,---,:- 3, -1.c•:•, ',:,.... -.,':==.• . -- : , - - -,----
r7.7.......„. ...„...,r:3,7„
� ,,t om'ate:t", . - - .-
r., _.. *& . _' ..+.s'.�"t: �. i,?- ,€ s .,_.�.. .. ? a .._ ..,. ,.,-.�..._ A.. ..cap,::..,' ' --.._,,..., ., ,_... .,. _,.
Duct Size Preview
Room or Source Minimum Maximurr Rough Design SP Duct Duct c DuctAct. D
Duct Name Velocitli Velocity Factor U10C Loss Velocity Lengtt Flow Flow Flow Size
System 1
Supply Runouts
Zone 1
1-Living Room Built-In 450 750 0 0.1 535.2 68 210 2--6
2-Bath 1 Built-In 450 750 0 0.1 377.1 12IIIIII 19 1--3
3-Bath 2 Built-In 450 750 0 0.1 652.6 37 57 1--4
4-Laundry Built-In 450 750 0 0.1 377.1 9 8 1--2
8-Entry Built-In 450 750 0 0.1 690.6 23 34 1-3
Zone 2
5-Bedroom 2 Built-In 450 750 0 0.1 452.7 77 267 3-6
6-Bedroom3 Built-In 450 750 0 0.1 645.5 53 176 2--5
7-Bedroom 4 Built-In 450 750 0 0.1 649.1 31 113 2-4
Other Ducts in System 1
Supply Main Trunk Built-In 650 900 0 0.1 758.6 311_I 790 10x1f.
System 2
Supply Runouts
Zone 1
9-Kittchen Dinina Built-In 450 750 0 0.1 555.3 118 436 4-6
10-Greaty Room Built-In 450 750 0 0.1 503.7 32 297 3--6
11-Hall Built-In 450 750 0 0.1 467 13 41 1-4
12-Half Bath Built-In 450 750 0 0.1 358.5 0 8 1-2
Zone 2
13-Master Bedroom Built-In 450 750 0 0.1 504.1 47 198 2--6
14-Master Bath Built-In 450 750 0 0.1 473.3 25 93 1-6
15-Closet Built-In 450 750 0 0.1 717 0 16 1--2
Other Ducts in System 2
Supply Main Trunk Built-In 650 900 0 0.1 784.7 235-I 959 11x16
System 3
Supply Runouts
Zone 1
16-Bedroom 5 Built-In 450 750 0 0.1 511.1 80 201 2-6
17-Bath 1 Built-In 450 750 0 0.1 675 23 33 1-3
18-Bedroom 6 Built-In 450 750 0 0.1 668.3 37 117 2--4
19-Closet Built-In 450 750 0 0.1 710.7 3 16 1-2
20-Hall Built-In 450 750 0 0.1 474.2 21.1 10 1--2
Other Ducts in System 3
Supply Main Trunk Built-In 650 900 0 0.1 677.4 145 I 376 8x1C
Summary
System 1
Heating Flow: 311
Coolina Flow: 790
System 2
Heatina Flow: 235
Cooling Flow: 959
System 3
Heating Flow: 145
Coolina Flow: 376
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
System 1 System 1 first Floor Summary Loads
Component Area Son Let San Total
Description Ouan Loss Gekt Gain Gehl
1D-cv-o: Glazing-Double pane, operable window, clear, 136 4,651 0 6,171 6,171
vinyl frame, ground reflectance=0.23, u-value 0.57,
SHGC 0.56
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 1016 3,962 0 1,340 1,340
cavity, no board insulation, siding finish,wood studs
19A-21 p: Floor-Over enclosed unconditioned crawl 1177 2,535 0 676 676
space, No insulation on exposed walls, sealed or
vented space, passive, R-21 blanket
Subtotals for structure: 11,148 0 8,187 8,187
People: 6 1,200 1,380 2,580
Equipment: 0 0 0
Lighting: 1300 4,433 4,433
Ductwork: 2,594 416 552 968
Infiltration: Winter CFM: 154, Summer CFM: 151 10,110 3,491 2,644 6,135
Ventilation:Winter CFM: 0, Summer CFM: 0 0 0 0 0
Exhaust: Winter CFM: 150, Summer CFM: 150
AED Excursion: 0 0 106 106
System 1 System lfirst Floor Load Totals: 23,852 5,107 17,303 22,409
Check Figures
Supply CFM: 790 CFM Per Square ft.: 0.671
Square ft. of Room Area: 1,177 Square ft. Per Ton: 630
Volume(ft3)of Cond. Space: 9,416
System Loads
Total Heating Required Including Ventilation Air: 23,852 Btuh 23.852 MBH
Total Sensible Gain: 17,303 Btuh 77
Total Latent Gain: 5,107 Btuh 23 %
Total Cooling Required Including Ventilation Air: 22,409 Btuh 1.87 Tons(Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
�.* ;" :' "kc`� yr s
,To-'Pzt�'a ,... 7m -. ...,�..,. r`�sir, - f
System 2 Middle Floor System Summary Loads
Component Area Sen Let Sen Toad
Description Quart Loss Gain Gain Gain
1 D-cv-o: Glazing-Double pane, operable window, clear, 228 7,795 0 10,803 10,803
vinyl frame, ground reflectance=0.23, u-value 0.57,
SHGC 0.56
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 852 3,323 0 1,123 1,123
cavity, no board insulation, siding finish,wood studs
Subtotals for structure: 11,118 0 11,926 11,926
People: 4 800 920 1,720
Equipment: 0 1,500 1,500
Lighting: 1400 4,774 4,774
Ductwork: 0 0 0 0
Infiltration:Winter CFM: 105, Summer CFM: 101 6,926 2,343 1,776 4,119
Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0
Exhaust: Winter CFM: 100, Summer CFM: 100
AED Excursion: 0 0 103 103
System 2 Middle Floor System Load Totals: 18,044 3,143 20,999 24,142
check Figures
Supply CFM: 959 CFM Per Square ft.: 0.841
Square ft. of Room Area: 1,140 Square ft. Per Ton: 567
Volume(ft3)of Cond. Space: 9,120
System Loads
Total Heating Required Including Ventilation Air: 18,044 Btuh 18.044 MBH
Total Sensible Gain: 20,999 Btuh 87 %
Total Latent Gain: 3,143 Btuh 13 %
Total Cooling Required Including Ventilation Air: 24,142 Btuh 2.01 Tons(Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
4 � �,
System 3 System 3 Top Floor Summary Loads
Component Ama San Lat Sett Total
Description tit Loss Gain Gain Gab"
1D-cv-o: Glazing-Double pane, operable window, clear, 52 1,781 0 1,735 1,735
vinyl frame, ground reflectance=0.23, u-value 0.57,
SHGC 0.56
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 340 1,326 0 450 450
cavity, no board insulation, siding finish,wood studs
12F-0sw: Part-Frame, R-21 insulation in 2 x 6 stud cavity, 288 374 0 374 374
no board insulation, siding finish,wood studs
18A1-36o: Roof/Ceiling-Roof Joists Between Roof Deck 573 997 0 447 447
and Ceiling or Foam Encapsulated Roof Joists,
Spray Foam Insulation, Dark or Bold-Color Asphalt
Shingle, Dark Metal, Dark Membrane, Dark Tar and
Gravel, R-36 open cell 1/2 lb. spray foam, 9.5 inches
in 2 x 10 joist cavity, 1 inch on joist
Subtotals for structure: 4,478 0 3,006 3,006
People: 4 800 920 1,720
Equipment: 0 0 0
Lighting: 750 2,558 2,558
Ductwork: 0 0 0 0
Infiltration:Winter CFM: 101, Summer CFM: 100 6,653 2,319 1,757 4,076
Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0
Exhaust: Winter CFM: 100, Summer CFM: 100
System 3 System 3 Top Floor Load Totals: 11,131 3,119 8,241 11,360
Check Figures
Supply CFM: 376 CFM Per Square ft.: 0.657
Square ft. of Room Area: 573 Square ft. Per Ton: 605
Volume(ft3)of Cond. Space: 4,392
System Loads
Total Heating Required Including Ventilation Air: 11,131 Btuh 11.131 MBH
Total Sensible Gain: 8,241 Btuh 73 %
Total Latent Gain: 3,119 Btuh 27 %
Total Cooling Required Including Ventilation Air: 11,360 Btuh 0.95 Tons(Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
System 1, Zone 1 Summary Loads (Peak Load Procedure for Rooms)
Component Ann Sen La# San Total
Description Quan Los* Gain Gain Goal
1D-cv-o: Glazing-Double pane, operable window, clear, 46 1,573 0 3,135 3,135
vinyl frame, ground reflectance=0.23, u-value 0.57,
SHGC 0.56
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 546 2,129 0 720 720
cavity, no board insulation, siding finish,wood studs
19A-21 p: Floor-Over enclosed unconditioned crawl 617 1,329 0 354 354
space, No insulation on exposed walls, sealed or
vented space, passive, R-21 blanket
Subtotals for structure: 5,031 0 4,209 4,209
People: 0 0 0 0
Equipment: 0 0 0
Lighting: 400 1,364 1,364
Ductwork: 1,248 0 205 205
Infiltration: Winter CFM: 79, Summer CFM: 78 5,195 1,794 1,359 3,153
System 1, Zone 1 Load Totals: 11,474 1,794 7,176 8,970
Check Figures
Supply CFM: 328 CFM Per Square ft.: 0.531
Square ft. of Room Area: 617 Square ft. Per Ton: 825
Volume(ft3)of Cond. Space: 4,936
Zone Loads
Total Heating Required: 11,474 Btuh 11.474 MBH
Total Sensible Gain: 7,176 Btuh 80
Total Latent Gain: 1,794 Btuh 20
Total Cooling Required: 8,970 Btuh 0.75 Tons(Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
System 1, Zone 2 Summary Loads Peak Load Procedure for Rooms)
Component Area San Lat San Tote
Description Quan Loss Gain Ofthl
1 D-cv-o: Glazing-Double pane, operable window, clear, 90 3,078 0 5,083 5,083
vinyl frame, ground reflectance=0.23, u-value 0.57,
SHGC 0.56
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 470 1,833 0 620 620
cavity, no board insulation, siding finish,wood studs
19A-21p: Floor-Over enclosed unconditioned crawl 560 1,206 0 322 322
space, No insulation on exposed walls, sealed or
vented space, passive, R-21 blanket
Subtotals for structure: 6,117 0 6,025 6,025
People: 6 1,200 1,380 2,580
Equipment: 0 0 0
Lighting: 900 3,069 3,069
Ductwork: 1,346 0 348 348
Infiltration:Winter CFM: 75, Summer CFM: 73 4,915 1,697 1,285 2,982
System 1, Zone 2 Load Totals: 12,378 2,897 12,173 15,070
Check Figures
Supply CFM: 556 CFM Per Square ft.: 0.993
Square ft. of Room Area: 560 Square ft. Per Ton: 446
Volume(ft3)of Cond. Space: 4,480
Zone Loads
Total Heating Required: 12,378 Btuh 12.378 MBH
Total Sensible Gain: 12,173 Btuh 81
Total Latent Gain: 2,897 Btuh 19 %
Total Cooling Required: 15,070 Btuh 1.26 Tons(Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
�.
u
����°,�� _ t «'fix � .d�,��* +f� '. <. _..,.4 .� ?'�,`.� �,.,-,.. �.�� ,.
System 2, Zone 1 Summary Loads (Peak Load Procedure for Rooms)
Component Area Sen Let San To
Dena iption Ousel Loss Gad Gail Gehl
1 D-cv-o: Glazing-Double pane, operable window, clear, 178 6,085 0 10,885 10,885
vinyl frame, ground reflectance =0.23, u-value 0.57,
SHGC 0.56
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 510 1,989 0 672 672
cavity, no board insulation, siding finish,wood studs
Subtotals for structure: 8,074 0 11,557 11,557
People: 2 400 460 860
Equipment: 0 1,500 1,500
Lighting: 700 2,387 2,387
Ductwork: 0 0 0 0
Infiltration:Winter CFM: 67, Summer CFM: 65 4,412 1,493 1,131 2,624
System 2,Zone 1 Load Totals: 12,486 1,893 17,109 19,002
Check
Supply CFM: 781 CFM Per Square ft.: 1.007
Square ft. of Room Area: 776 Square ft. Per Ton: 490
Volume(ft3)of Cond. Space: 6,208
Zone Loads
Total Heating Required: 12,486 Btuh 12.486 MBH
Total Sensible Gain: 17,109 Btuh 90 %
Total Latent Gain: 1,893 Btuh 10 %
Total Cooling Required: 19,002 Btuh 1.58 Tons(Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
System 2, Zone 2 Summary Loads (Peak Load Procedure for Rooms)
Component Area Sen Lat Son Tick
Description alert Loss Gal Gsih C
1 D-cv-o: Glazing-Double pane, operable window, clear, 50 1,710 0 2,740 2,740
vinyl frame, ground reflectance=0.23, u-value 0.57,
SHGC 0.56
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 342 1,334 0 451 451
cavity, no board insulation, siding finish,wood studs
Subtotals for structure: 3,044 0 3,191 3,191
People: 2 400 460 860
Equipment: 0 0 0
Lighting: 700 2,387 2,387
Ductwork: 0 0 0 0
Infiltration: Winter CFM: 38, Summer CFM: 37 2,514 850 645 1,495
System 2, Zone 2 Load Totals: 5,558 1,250 6,712 7,962
Check Figures
Supply CFM: 307 CFM Per Square ft.: 0.842
Square ft. of Room Area: 364 Square ft. Per Ton: 549
Volume(ft3)of Cond. Space: 2,912
Zone Loads
Total Heating Required: 5,558 Btuh 5.558 MBH
Total Sensible Gain: 6,712 Btuh 84 cio
Total Latent Gain: 1,250 Btuh 16
Total Cooling Required: 7,962 Btuh 0.66 Tons(Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
Y "°. �^'. `
; -
# i srt
5._ .r a ,
System 3, Zone 1 Summary Loads (Average Load Procedure for Rooms)
Component Area San Lat Set Total
Description Quam Loss Can Gain C
1 D-cv-o: Glazing-Double pane, operable window, clear, 52 1,781 0 1,735 1,735
vinyl frame, ground reflectance =0.23, u-value 0.57,
SHGC 0.56
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 340 1,326 0 450 450
cavity, no board insulation, siding finish,wood studs
12F-0sw: Part-Frame, R-21 insulation in 2 x 6 stud cavity, 288 374 0 374 374
no board insulation, siding finish,wood studs
18A1-36o: Roof/Ceiling-Roof Joists Between Roof Deck 573 997 0 447 447
and Ceiling or Foam Encapsulated Roof Joists,
Spray Foam Insulation, Dark or Bold-Color Asphalt
Shingle, Dark Metal, Dark Membrane, Dark Tar and
Gravel, R-36 open cell 1/2 lb. spray foam, 9.5 inches
in 2 x 10 joist cavity, 1 inch on joist
Subtotals for structure: 4,478 0 3,006 3,006
People: 4 800 920 1,720
Equipment: 0 0 0
Lighting: 750 2,558 2,558
Ductwork: 0 0 0 0
Infiltration: Winter CFM: 101, Summer CFM: 100 6,653 2,319 1,757 4,076
System 3,Zone 1 Load Totals: 11,131 3,119 8,241 11,360
Check Figures
Supply CFM: 376 CFM Per Square ft.: 0.657
Square ft. of Room Area: 573 Square ft. Per Ton: 605
Volume(ft3)of Cond. Space: 4,392
Zone Loads
Total Heating Required: 11,131 Btuh 11.131 MBH
Total Sensible Gain: 8,241 Btuh 73
Total Latent Gain: 3,119 Btuh 27 %
Total Cooling Required: 11,360 Btuh 0.95 Tons(Based On Sensible+ Latent)
Notes
Rhvac is an ACCA approved Manual J and Manual D computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\betterwood harbor dr.rh9 Wednesday, February 5, 2020, 7:12 AM
Accela Citizen Access Page 1 of 2
Announcements Register for an Account Login
Need Help?For technical assistance in using this web application,please call the Search...
ePLACE Help Desk Team at(844)733-7522 .�z or(844)73-ePLAC between the _._.
hours of 7:30 AM-5:00 PM Monday-Friday,with the exception of all
Commonwealth and Federally observed holidays.If you prefer,you can also
e-mail us at ePLACE_helpdesk@state.ma.us.For assistance with non-
technical issues,please contact the issuing Agency directly using the links
below.
Contact Alcoholic Beverages Control Commission
Contact Department of Labor Standards
Contact Division of Professional Licensure
To apply for an Energy and Environmental Affairs(DEP,MDAR or DCR)permit or
license,please click here.
Convenience Fee:
For DPL and DLS transactions,please note that all on line credit card
transactions incur a 2.35%convenience fee.There is a fee of$0.35 associated
with online payment by ACH/EFT.
For ABCC transactions,please note that all online credit card transactions incur
a 2.35%convenience fee
Home Manage Licenses,Permits and Certificates File and Track Complaints
Advanced Search
Please refer to the Licensing Entity's website for additional information regarding the status and discipline information shown below.
For DPL information,please visit the DPL website.
For ABCC information,please visit the ABCC website.
Information Pertaining To:
Sheet Metal Master 4776
Licensee Detail
License Number: 4776
Licensing Entity: Board of Examiners of Sheet Metal Workers
License Type: Sheet Metal Master
Type Class: M1
License Issue Date: 12/03/2010
License Expiration Date: 01/28/2022 Status: Current
Current Discipline:
Prior Discipline:
Name: ERIC V MEADS
Business Name:
DBA Name:
Public Documents
https://elicensing.mass.gov/CitizenAccess/GeneralProperty/LicenseeDetail.aspx?LicenseeN... 2/6/2020