Loading...
HomeMy WebLinkAboutEngineering letter DWD ENGINEERING, INC. 5 MICHAEL ROAD EAST BRIDGEWATER,MA 02333 (508)378-9602 domdean@aol.com December 27, 2019 Mr. Timothy Sears-Building Inspector Yarmouth Building Department 1146 Route 28 Yarmouth, MA 02664 RE: Framing Conditions ygf,Mov'h„ 191 Diane Avenue-South Falmeeth, MA Dear Mr. Sears, On Thursday, December 26, I visited the above referenced site to review the roof framing conditions for the addition being built. Due to the existing layout, the roof(and supporting posts and beams in the attic) was not able to be framed as shown on the design sketch that I stamped. The framer reached out to Mid-Cape Lumber to provide an alternate scheme. Based on the existing conditions I am in agreement with the proposed framing changes and no further remedial work is required. If you have any questions concerning this letter or if I can be of further assistance, please do not hesitate to contact me. Si rely, ♦ ,4411h E• Ast o .E. Cc: Rowland Bevan Pr I tD0i,1ENIC W. �G DeANGELO m, v STRUCTURAL . A Nc 350620 A 'PO �FCISTS'C A ♦♦�S SlONALENC�,.�